Steel BeamInstallers
Grey steel goalpost frame installed where a rear wall has been removed

Steel goalpost frames · Felling

Steel goalpost frames in Felling

Steel goalpost frames in Felling, from free survey to completion certificate.

  • Survey, design and installation in one
  • Covering NE8, NE9, NE10
  • Inspected before it is covered

Free survey in Felling

Tell us about the steel goalpost frame job in Felling.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What steel goalpost frames involve in Felling

Our steel goalpost frames service in Felling covers everything from the first visit to the completion paperwork. It sits about 2.2 miles from Newcastle upon Tyne, which we also cover. Postcode districts we cover here include NE8, NE9, NE10 and NE11.

When a rear wall is opened almost corner to corner, or the brickwork either side is too thin, cracked or broken up by openings to take a concentrated load, a beam on padstones is not enough. A goalpost frame brings its own supports: two columns carry the beam's ends straight down to new foundations, so the walls around the opening are not relied on.

Things to plan for

  • Keep the engineer's calculations, the frame drawings and the building control completion certificate together. They show a future buyer's surveyor how the opening is supported and save questions about the columns when the house is sold.
  • A goalpost frame is structural work, so building regulations approval is needed in England and Wales, a building warrant before work in Scotland, and a building control application in Northern Ireland. The inspector typically wants to see the pad excavations as well as the finished steel.
  • Columns are commonly universal columns or square hollow sections, welded to steel base plates at the foot and cap plates at the head. Holding-down bolts fix the base plates to the pad, and grout fills the gap beneath once the frame is level.
  • Stability is part of the design, not just strength. A frame standing in a wide opening can sway sideways if the joints are too flexible, so the engineer decides whether the connections must be moment-resisting or whether the frame is tied back to the surrounding structure.
  • While the old wall or piers come out, the floor, walls and roof above are held on props and needles. These stay in until the frame is fully bolted, levelled and packed, so the structure is never left without support.

How the job runs in Felling

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to Gateshead Council, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for steel goalpost frames in Felling

As a guide, budget £1,850–£5,600 including VAT for steel goalpost frame in Felling, based on published UK cost guides adjusted for prices in the North East (-7%).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£1,850–£5,600Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Structural calculations for a beam£230–£700Site measure or photos, beam and padstone design and calculations for building control
Steel column or post£460–£1,400 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Side return extension steelwork£3,250–£7,900Beams and posts along the old side wall line, propping and approvals (extension build extra)

Figures include our approximate regional adjustment for prices in the North East (-7%) and are rounded. How these figures are worked out.

Building rules for Felling

Structural openings in English homes need building regulations approval before work starts. Gateshead Council can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Steel goalpost frames near Felling

Questions about steel goalpost frames in Felling

How much do steel goalpost frames cost in Felling?

As a guide, budget £1,850–£5,600 including VAT for steel goalpost frame in Felling, based on published UK cost guides adjusted for prices in the North East (-7%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

What happens at the survey visit in Felling?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Can a goalpost frame be hidden?

Usually, yes. The columns can be boxed in with fire-rated plasterboard so they read as small piers, set inside new walls, or hidden within the line of an extension's side walls. The beam is boxed like any other steel. Some owners prefer to leave the frame exposed and painted as a design feature.

Can a goalpost column go next to my neighbour's wall?

It can, but in England and Wales it may bring in the Party Wall etc. Act 1996. Digging a pad near a neighbour's building to below the level of its foundations, or fixing into a shared wall, can be notifiable. We arrange notices through a party wall surveyor where needed. There is no equivalent Act in Scotland or Northern Ireland.

What is the difference between a goalpost and a portal frame?

A domestic goalpost is a simple version of a portal frame. Both use columns and a beam joined together, but a full portal frame has rigid joints designed to resist sideways loads on its own, as used in steel-framed industrial buildings. In a house, the engineer decides how rigid the goalpost joints need to be for that opening.

Do you also work near Felling?

Yes. We also cover nearby towns including Gateshead, Newcastle upon Tyne, Hebburn and Wallsend.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.