Steel goalpost frames in Conwy

Steel goalpost frames across Conwy, designed by a structural engineer and signed off by building control.

  • Survey, design and installation in one
  • Covering LL22, LL24, LL25, LL26
  • Inspected before it is covered

Free survey in Conwy

Tell us about your steel goalpost frames project in Conwy.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What steel goalpost frames involve in Conwy

A steel goalpost frame is a beam supported on two steel columns, bolted together into one rigid unit shaped like a goalpost. It is used where the masonry either side of an opening cannot take the beam's load, or where a wide opening leaves little wall to bear on. The columns stand on base plates fixed to concrete pad foundations sized by the engineer.

Steel goalpost frames are one of the most common structural jobs in homes across Conwy. Towns we cover include Llandudno, Abergele and Colwyn Bay, among other places in the area. Every job starts with a survey visit, then calculations from a structural engineer, so the steel suits the house in front of us rather than a rule of thumb.

Things to plan for

  • Price depends on the opening width, the loads the beam carries, the number of bolted connections, the depth of the pads and how easily the steel can be carried in. Any redesign after the ground is opened is priced before it goes ahead.
  • Column pads can clash with drains, gas pipes and underfloor heating runs below the floor. These are located before digging, and if a drain runs where a pad needs to go, the engineer may move the column or redesign the pad.
  • Each column usually needs its own concrete pad foundation, because a column delivers a heavy point load that an ordinary floor slab or old strip footing may not take. The engineer sets the pad size and depth from the load and the ground conditions found.
  • Columns can be boxed in with fire-rated plasterboard to look like small piers, built into new stud walls, or left exposed and painted. Where an extension wall continues past the opening, a column can often sit within it out of sight.
  • Columns are commonly universal columns or square hollow sections, welded to steel base plates at the foot and cap plates at the head. Holding-down bolts fix the base plates to the pad, and grout fills the gap beneath once the frame is level.

What happens, step by step

  1. Survey in Conwy

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit the application or notice to Conwy County Borough Council under the Building Regulations as they apply in Wales, before work starts.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What do steel goalpost frames cost in Conwy?

As a guide, budget £1,800–£5,450 including VAT for steel goalpost frame in Conwy, based on published UK cost guides adjusted for prices in Wales (-9%).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£1,800–£5,450Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Structural calculations for a beam£230–£680Site measure or photos, beam and padstone design and calculations for building control
Rear wall opening for bi-fold or sliding doors£2,300–£6,350External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Steel column or post£460–£1,360 per columnColumn supplied and fitted with base and cap plates on a pad foundation

Figures include our approximate regional adjustment for prices in Wales (-9%) and are rounded. How these figures are worked out.

Building control and neighbours in Conwy

Removing a load-bearing wall in Wales needs approval under the Welsh building regulations before work starts. For Conwy the application goes to Conwy County Borough Council or a registered building control approver, with the engineer's calculations, and a completion certificate follows the final inspection.

Where the steel bears into a wall shared with next door, notice must be served under the Party Wall etc. Act 1996. If your neighbour dissents, surveyors agree how the work is done before it starts.

Building rules in Wales

Steel goalpost frames by town

Steel goalpost frames in Conwy: your questions

Do I need a party wall agreement for steel goalpost frames in Conwy?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

What happens at the survey visit in Conwy?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Is a goalpost frame more expensive than a beam?

Generally yes, because there is more steel, more fabrication and new foundations to dig and pour. Against that, a goalpost can avoid rebuilding weak piers or strengthening walls so they can take a beam. Our itemised written quote shows the frame, pads, propping and making good separately so you can see where the cost sits.

How long does it take to install a steel goalpost?

Allow around one to two weeks on site for a typical job. Breaking out and digging the pads, the foundation inspection, pouring concrete and letting it gain strength take up much of that time. Erecting and bolting the frame itself is often done in a day, followed by inspection and boxing in.

Does a goalpost frame need foundations?

Yes, in most cases each column needs a concrete pad foundation beneath it. A column concentrates a lot of weight on a small area, and a normal floor slab is rarely designed for that. The engineer sizes each pad, and building control usually inspects the excavation before the concrete goes in.

Can a goalpost frame be hidden?

Usually, yes. The columns can be boxed in with fire-rated plasterboard so they read as small piers, set inside new walls, or hidden within the line of an extension's side walls. The beam is boxed like any other steel. Some owners prefer to leave the frame exposed and painted as a design feature.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.