Steel BeamInstallers
Steel column with a bolted base plate on a concrete pad supporting a beam

Steel columns & posts · Yeovil

Steel columns & posts in Yeovil

Steel columns & posts in Yeovil, from free survey to completion certificate.

  • Survey, design and installation in one
  • Covering BA20, BA21, BA22
  • Inspected before it is covered

Free survey in Yeovil

Tell us about the steel columns & post job in Yeovil.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What steel columns & posts involve in Yeovil

We cover steel columns & posts in Yeovil (BA20, BA21, BA22) and the streets around it. We also cover the surrounding towns and villages in Somerset. Each job is designed by a structural engineer and approved through local building control before work begins.

We arrange the engineer's design, building control, the pad foundation, propping, supply and fixing of the column, and the boxing or finishing afterwards. You receive an itemised written quote, and the price is fixed in writing once the position, specification and scope are agreed.

Key points for your project

  • The base plate is welded to the foot of the column and fixed to the pad with holding-down bolts. A cap plate at the top bolts to the beam above, so the two act together and the beam cannot slide off its support.
  • A column delivers its load to the ground through a small area, so it normally stands on a concrete pad foundation rather than straight onto a floor slab. The pad spreads the load into firm ground at a depth set by the engineer.
  • A post is needed when a beam has nothing adequate to bear on, or when a span is long enough that a central support gives a shallower, lighter beam. The engineer weighs up a column against a deeper beam for each layout.
  • Steel at floor level can corrode if it sits in damp. The detail at the base is designed to keep damp away, using grout, protective paint and the floor's damp-proof membrane, and a column in a cellar or garage may need a heavier coating.
  • Exposed columns are commonly protected with intumescent paint applied to the thickness the specification calls for, which keeps a slim profile. Boxed columns are clad in fire-rated plasterboard and finished with corner beads, skim and a skirting to match the room.

How the job runs in Yeovil

  1. Free visit

    A short visit to Yeovil to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

How much should I budget in Yeovil?

As a guide, budget £520–£1,540 per column including VAT for steel column or post in Yeovil, based on published UK cost guides adjusted for prices in the South West (+3%).

JobTypical guide rangeWhat it usually covers
Steel column or post£520–£1,540 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Steel goalpost frame£2,050–£6,200Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Basement or cellar steelwork£2,600–£6,700Beams and columns with pad foundations under the floor above (excavation and waterproofing extra)
RSJ supply and fit (single beam)£820–£2,580 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)

Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.

Building control and neighbours in Yeovil

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Steel columns & posts near Yeovil

Questions about steel columns & posts in Yeovil

How much do steel columns & posts cost in Yeovil?

As a guide, budget £520–£1,540 per column including VAT for steel column or post in Yeovil, based on published UK cost guides adjusted for prices in the South West (+3%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

What happens at the survey visit in Yeovil?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

What is the difference between a column and a padstone?

A padstone is a block bedded into a wall to spread a beam's load into the masonry beneath. A column replaces the need for a wall altogether, carrying the load down to its own foundation. Where the wall below a beam end is too weak for a padstone, the engineer may call for a column instead.

Can I put a steel post in the middle of a beam?

Yes, a central post is a common way to support a long beam, and it often lets the engineer specify a shallower steel. The post needs its own foundation and has to sit somewhere that works with the room layout. The engineer compares a post against a single deeper beam and specifies whichever suits the loads and the space.

Will a column interfere with underfloor heating?

It can, because the pad has to be dug through the floor where pipes may run. We trace heating loops, drains and cables before cutting and, where possible, move the column position slightly to miss them. If a loop has to be cut, it is repaired and pressure tested by a heating engineer before the floor is reinstated.

Do you cover Yeovil for steel columns & posts?

Yes. We carry out steel columns & posts in Yeovil and the BA20, BA21 and BA22 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.