Steel BeamInstallers
Steel column with a bolted base plate on a concrete pad supporting a beam

Steel columns & posts · Clevedon

Steel columns & posts in Clevedon

Steelwork, approvals and making good for steel columns & posts in Clevedon and nearby.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Clevedon

Tell us about the steel columns & post job in Clevedon.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning steel columns & posts in Clevedon

Clevedon has a mix of housing, and steel columns & posts need a slightly different approach in each. The wider Somerset area is covered as well. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.

We arrange the engineer's design, building control, the pad foundation, propping, supply and fixing of the column, and the boxing or finishing afterwards. You receive an itemised written quote, and the price is fixed in writing once the position, specification and scope are agreed.

Key points for your project

  • Columns on upper floors cannot simply stand on joists. The load has to be traced down through the building to the ground, which can mean a column directly below, a beam to collect it, or a redesign of the layout.
  • Hollow sections, either square or circular, give a neat, slim profile and are common where a post stays on show. Universal columns have an H-shaped section and are often used where the post will be boxed in or built into a wall.
  • While the existing support is removed or the new column goes in, props hold the beam and the structure above. They are only taken out once the column is fixed, packed tight at the head and grouted at the base.
  • The noisiest part is cutting the floor and digging the pad, usually a day's work. The concrete then needs time to gain strength, so the column is often fitted on a later visit once it has cured enough to take load.
  • A tall, slender column can buckle under load before the steel itself is overstressed. That is why the engineer checks the height between restraints as well as the weight carried, and why a taller column may need a heavier section.

What happens, step by step

  1. Survey in Clevedon

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to North Somerset Council, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What do steel columns & posts cost in Clevedon?

As a guide, budget £520–£1,540 per column including VAT for steel column or post in Clevedon, based on published UK cost guides adjusted for prices in the South West (+3%).

JobTypical guide rangeWhat it usually covers
Steel column or post£520–£1,540 per columnColumn supplied and fitted with base and cap plates on a pad foundation
RSJ supply and fit (single beam)£820–£2,580 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Basement or cellar steelwork£2,600–£6,700Beams and columns with pad foundations under the floor above (excavation and waterproofing extra)
Steel goalpost frame£2,050–£6,200Two posts and a beam bolted as a frame, pad foundations, base plates and fitting

Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.

Building control and neighbours in Clevedon

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either North Somerset Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Steel columns & posts near Clevedon

Questions about steel columns & posts in Clevedon

Who approves steel columns & posts in Clevedon?

Structural work in Clevedon needs a building notice or full plans application to North Somerset Council or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Do I need a party wall agreement for steel columns & posts in Clevedon?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Can I put a steel post in the middle of a beam?

Yes, a central post is a common way to support a long beam, and it often lets the engineer specify a shallower steel. The post needs its own foundation and has to sit somewhere that works with the room layout. The engineer compares a post against a single deeper beam and specifies whichever suits the loads and the space.

How long does it take to fit a steel post?

The column itself can often be fixed in a day, but the whole job usually spans a few working days. The floor is cut and the pad dug, building control inspects it, the concrete is poured and left to cure, and then the column goes in and is packed tight to the beam.

Can a steel post replace a supporting wall?

Yes, in many layouts a wall can come out with a beam above it and one or more posts taking the beam's load down to the ground. This keeps most of the openness while shortening the span. The engineer decides how many posts are needed and where they can go.

What happens at the survey visit in Clevedon?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.