Steel BeamInstallers
Steel column with a bolted base plate on a concrete pad supporting a beam

Steel columns & posts · Northampton

Steel columns & posts in Northampton

Steelwork, approvals and making good for steel columns & posts in Northampton and nearby.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Northampton and nearby

Free survey in Northampton

Tell us about the steel columns & post job in Northampton.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What steel columns & posts involve in Northampton

We carry out steel columns & posts in Northampton, covering the NN1, NN2, NN3, NN4 and NN5 postcode districts. The wider Northamptonshire area is covered as well. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.

Sometimes the right support for a beam is not a wall at all. A long span can be broken in two with a slim post in the middle, a beam can land on a column where the masonry below is weak, or the corner of an L-shaped opening can be held up by a single post instead of a brick pier.

Worth knowing before you start

  • Older properties sometimes have cast iron columns, timber posts or brick piers doing this job, especially in cellars and former shops. Their condition and capacity are often unknown, so the engineer assesses whether they can stay or need replacing with new steel.
  • Placing a post well can make an open-plan room work better. It can mark the edge of a kitchen island, frame a dining area or line up with a worktop end, so it reads as part of the design rather than an obstruction.
  • Adding a structural column is building work that building control needs to approve, with the pad usually inspected before concrete and the column before it is covered. The completion certificate at the end is the record to keep for any future sale.
  • While the existing support is removed or the new column goes in, props hold the beam and the structure above. They are only taken out once the column is fixed, packed tight at the head and grouted at the base.
  • The noisiest part is cutting the floor and digging the pad, usually a day's work. The concrete then needs time to gain strength, so the column is often fitted on a later visit once it has cured enough to take load.

How the job runs in Northampton

  1. Free visit

    A short visit to Northampton to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What do steel columns & posts cost in Northampton?

As a guide, budget £490–£1,470 per column including VAT for steel column or post in Northampton, based on published UK cost guides adjusted for prices in the East Midlands (-2%).

JobTypical guide rangeWhat it usually covers
Steel column or post£490–£1,470 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Basement or cellar steelwork£2,450–£6,350Beams and columns with pad foundations under the floor above (excavation and waterproofing extra)
Fire protection to a steel beam£150–£590 per beamFire-rated board boxing or an intumescent coating system as specified
Steel goalpost frame£1,950–£5,900Two posts and a beam bolted as a frame, pad foundations, base plates and fitting

Figures include our approximate regional adjustment for prices in the East Midlands (-2%) and are rounded. How these figures are worked out.

Building control and neighbours in Northampton

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Steel columns & posts near Northampton

Steel columns & posts in Northampton: your questions

What happens at the survey visit in Northampton?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Do I need a party wall agreement for steel columns & posts in Northampton?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

How long does it take to fit a steel post?

The column itself can often be fixed in a day, but the whole job usually spans a few working days. The floor is cut and the pad dug, building control inspects it, the concrete is poured and left to cure, and then the column goes in and is packed tight to the beam.

Can a steel column be left exposed?

Yes, many people leave a column on show, painted to suit the room. In homes exposed steel commonly needs fire protection, often intumescent paint applied to the specified thickness as part of a compatible paint system. Building control checks the protection meets what was specified. Boxing in with fire-rated plasterboard is the alternative where a hidden column is preferred.

Does a steel column need a foundation?

Almost always, yes. A column puts a concentrated load onto a small patch of ground, and most floor slabs are not designed for that. The engineer specifies a concrete pad of a set size and depth, building control usually inspects the hole before concrete is poured, and the column is bolted down once the pad has cured.

Can you work on older or listed homes in Northampton?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.