Steel BeamInstallers
Steel column with a bolted base plate on a concrete pad supporting a beam

Steel columns & posts · Greater Manchester

Steel columns & posts in Greater Manchester

Survey, engineer's design and installation of steel columns & posts anywhere in Greater Manchester.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Greater Manchester

Tell us about your steel columns & posts project in Greater Manchester.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our steel columns & posts service in Greater Manchester

A steel column is an upright structural element that collects the load from a beam, floor or roof and carries it down to a foundation. In homes it is usually a square or circular hollow section or a universal column, welded to a base plate fixed to a concrete pad, and sized by a structural engineer for the load it carries.

If you are planning steel columns & posts in Greater Manchester, the order of work matters as much as the steel: survey, calculations, approval, propping, installation, inspection and making good. We can survey in places such as Sale, Bury and Middleton and the villages around them. We run that sequence for you as one job with one point of contact.

What to expect

  • Older properties sometimes have cast iron columns, timber posts or brick piers doing this job, especially in cellars and former shops. Their condition and capacity are often unknown, so the engineer assesses whether they can stay or need replacing with new steel.
  • Steel at floor level can corrode if it sits in damp. The detail at the base is designed to keep damp away, using grout, protective paint and the floor's damp-proof membrane, and a column in a cellar or garage may need a heavier coating.
  • A column delivers its load to the ground through a small area, so it normally stands on a concrete pad foundation rather than straight onto a floor slab. The pad spreads the load into firm ground at a depth set by the engineer.
  • The noisiest part is cutting the floor and digging the pad, usually a day's work. The concrete then needs time to gain strength, so the column is often fitted on a later visit once it has cured enough to take load.
  • Hollow sections, either square or circular, give a neat, slim profile and are common where a post stays on show. Universal columns have an H-shaped section and are often used where the post will be boxed in or built into a wall.

What happens, step by step

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for steel columns & posts in Greater Manchester

As a guide, budget £480–£1,440 per column including VAT for steel column or post in Greater Manchester, based on published UK cost guides adjusted for prices in the North West (-4%).

JobTypical guide rangeWhat it usually covers
Steel column or post£480–£1,440 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Steel goalpost frame£1,900–£5,750Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Fire protection to a steel beam£140–£580 per beamFire-rated board boxing or an intumescent coating system as specified
RSJ supply and fit (single beam)£770–£2,400 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)

Figures include our approximate regional adjustment for prices in the North West (-4%) and are rounded. How these figures are worked out.

Building control and neighbours in Greater Manchester

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Questions about steel columns & posts in Greater Manchester

Do I need a party wall agreement for steel columns & posts in Greater Manchester?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Can I stay at home while the work is done in Greater Manchester?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

How long does it take to fit a steel post?

The column itself can often be fixed in a day, but the whole job usually spans a few working days. The floor is cut and the pad dug, building control inspects it, the concrete is poured and left to cure, and then the column goes in and is packed tight to the beam.

Do I need building control for a steel column?

Yes. A new structural column is building work under the building regulations in England and Wales, and needs a building warrant first in Scotland and a building control application in Northern Ireland. Inspectors normally check the foundation excavation and the fixed column before it is covered. We deal with the application, notices and inspection visits.

Will a column interfere with underfloor heating?

It can, because the pad has to be dug through the floor where pipes may run. We trace heating loops, drains and cables before cutting and, where possible, move the column position slightly to miss them. If a loop has to be cut, it is repaired and pressure tested by a heating engineer before the floor is reinstated.

Does a steel column need a foundation?

Almost always, yes. A column puts a concentrated load onto a small patch of ground, and most floor slabs are not designed for that. The engineer specifies a concrete pad of a set size and depth, building control usually inspects the hole before concrete is poured, and the column is bolted down once the pad has cured.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.