Steel BeamInstallers
Steel column with a bolted base plate on a concrete pad supporting a beam

Steel columns & posts · Maidenhead

Steel columns & posts in Maidenhead

Steel columns & posts for homes in SL6, designed by a structural engineer.

  • Survey, design and installation in one
  • Covering SL6
  • Inspected before it is covered

Free survey in Maidenhead

Tell us about the steel columns & post job in Maidenhead.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning steel columns & posts in Maidenhead

Need steel columns & posts in Maidenhead? We also work in nearby Slough, roughly 5.4 miles away. We survey the property, arrange the engineer's design, deal with Royal Borough of Windsor and Maidenhead, fit the steel and make good, all under one quote for SL6 addresses.

We arrange the engineer's design, building control, the pad foundation, propping, supply and fixing of the column, and the boxing or finishing afterwards. You receive an itemised written quote, and the price is fixed in writing once the position, specification and scope are agreed.

What to expect

  • A column delivers its load to the ground through a small area, so it normally stands on a concrete pad foundation rather than straight onto a floor slab. The pad spreads the load into firm ground at a depth set by the engineer.
  • Steel at floor level can corrode if it sits in damp. The detail at the base is designed to keep damp away, using grout, protective paint and the floor's damp-proof membrane, and a column in a cellar or garage may need a heavier coating.
  • A post is needed when a beam has nothing adequate to bear on, or when a span is long enough that a central support gives a shallower, lighter beam. The engineer weighs up a column against a deeper beam for each layout.
  • While the existing support is removed or the new column goes in, props hold the beam and the structure above. They are only taken out once the column is fixed, packed tight at the head and grouted at the base.
  • The noisiest part is cutting the floor and digging the pad, usually a day's work. The concrete then needs time to gain strength, so the column is often fitted on a later visit once it has cured enough to take load.

From survey to sign-off in Maidenhead

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to Royal Borough of Windsor and Maidenhead, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for steel columns & posts in Maidenhead

As a guide, budget £560–£1,680 per column including VAT for steel column or post in Maidenhead, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Steel column or post£560–£1,680 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control
Basement or cellar steelwork£2,800–£7,300Beams and columns with pad foundations under the floor above (excavation and waterproofing extra)
Fire protection to a steel beam£170–£670 per beamFire-rated board boxing or an intumescent coating system as specified

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Approvals in Maidenhead

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Royal Borough of Windsor and Maidenhead or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Steel columns & posts near Maidenhead

Steel columns & posts in Maidenhead: your questions

Can I stay at home while the work is done in Maidenhead?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Do you also work near Maidenhead?

Yes. We also cover nearby towns including Slough, Windsor, High Wycombe and Bracknell.

Do I need building control for a steel column?

Yes. A new structural column is building work under the building regulations in England and Wales, and needs a building warrant first in Scotland and a building control application in Northern Ireland. Inspectors normally check the foundation excavation and the fixed column before it is covered. We deal with the application, notices and inspection visits.

Can a steel column be left exposed?

Yes, many people leave a column on show, painted to suit the room. In homes exposed steel commonly needs fire protection, often intumescent paint applied to the specified thickness as part of a compatible paint system. Building control checks the protection meets what was specified. Boxing in with fire-rated plasterboard is the alternative where a hidden column is preferred.

How thin can a steel support post be?

It depends entirely on the load, the height and how the post is restrained, so there is no standard size. Hollow sections often give the slimmest look for a given strength, and an engineer can sometimes reduce the section by adding restraint partway up. They specify the exact section after calculating the load.

Can you work on older or listed homes in Maidenhead?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.