Planning side return extension steels in Solihull
We cover side return extension steels in Solihull (B90, B91, B92) and the streets around it. We also work in nearby Birmingham, roughly 6.8 miles away. Each job is designed by a structural engineer and approved through Solihull Council before work begins.
Many Victorian and Edwardian terraces have a narrow back wing, often called an outrigger, with a strip of yard down one side. Infilling that strip turns a galley kitchen into a wide family room, but the outrigger's side wall usually holds up a bathroom or bedroom above, so it has to be replaced with steel.
Key points for your project
- Fitting the steel frame for a side return usually takes a few working days on site, depending on how many beams and columns there are. It is scheduled with the builder so the new space can be roofed and weathertight soon after the old wall comes down.
- Propping a side return is awkward because space in a narrow kitchen is tight and the infill side is often open ground. Props outside may stand on temporary pads or boards, set so they do not sink or shift in wet weather.
- The kitchen is usually out of use while the side wall comes down and the frame goes in, so many households set up a temporary kitchen elsewhere in the house. The rest of the property normally stays in use throughout the steel stage.
- The number of beams, columns and connections drives steel cost more than the length of the side return alone. Keep the calculations, any party wall paperwork and the completion certificate together for when the house is sold.
- Victorian outrigger walls are often a single brick thick in soft lime mortar, sometimes on very shallow footings. The engineer may ask for trial holes before deciding whether new foundations are needed under the column positions or beam ends.
What happens, step by step
Free visit
A short visit to Solihull to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to Solihull Council, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
How much should I budget in Solihull?
As a guide, budget £3,500–£8,500 including VAT for side return extension steelwork in Solihull, based on published UK cost guides adjusted for prices in the West Midlands (no adjustment).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Side return extension steelwork | £3,500–£8,500 | Beams and posts along the old side wall line, propping and approvals (extension build extra) |
| Fire protection to a steel beam | £150–£600 per beam | Fire-rated board boxing or an intumescent coating system as specified |
| Temporary works and propping | £150–£500 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
| Party wall surveyor (agreed surveyor, per neighbour) | £900–£2,000 per neighbour | Schedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only) |
Figures include our approximate regional adjustment for prices in the West Midlands (no adjustment) and are rounded. How these figures are worked out.
Building rules for Solihull
Structural openings in English homes need building regulations approval before work starts. Solihull Council can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Side return extension steels near Solihull
- Shirley 1.6 mi
- Acocks Green 2.9 mi
- Birmingham 6.8 mi
- Aston 7.3 mi
- Bartley Green 9.2 mi
- Kenilworth 9.5 mi
Questions about side return extension steels in Solihull
Can you work on older or listed homes in Solihull?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
Do you also work near Solihull?
Yes. We also cover nearby towns including Shirley, Acocks Green, Birmingham and Aston.
What steels do I need for a side return extension?
Usually a long beam along the line of the old outrigger side wall, often a second beam opening the back of the main house, and one or more columns where the loads meet. The exact arrangement depends on the house and the layout, and a structural engineer specifies every beam, column and connection.
Why does a side return need columns?
Columns are used where two beams meet or where there is not enough solid wall to carry the end of a beam. The column takes the concentrated load down to a pad foundation in the ground. Sometimes it can be hidden in a wall nib or boxed in neatly.
Can the steel beam be left exposed in a side return?
Yes, and many people like the look of exposed steel under a glazed roof. It usually still needs fire protection, so it is coated with an intumescent paint system to the specified thickness, then finished in your chosen colour. The engineer and building control confirm what protection is required.
Do I need a party wall agreement for side return extension steels in Solihull?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.