Steel columns & posts · Solihull
Steel columns & posts in Solihull
Steel columns & posts for homes in B90, B91, B92, designed by a structural engineer.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Planning steel columns & posts in Solihull
Our steel columns & posts service in Solihull covers everything from the first visit to the completion paperwork. Solihull is around 6.8 miles from Birmingham, and we cover both. Postcode districts we cover here include B90, B91, B92 and B93.
Sometimes the right support for a beam is not a wall at all. A long span can be broken in two with a slim post in the middle, a beam can land on a column where the masonry below is weak, or the corner of an L-shaped opening can be held up by a single post instead of a brick pier.
Worth knowing before you start
- Underfloor heating pipes, drains and cables in the slab can sit right where a pad is wanted. These are traced before cutting, and the column position is adjusted where possible rather than damaging a heating loop or drain run.
- The base plate is welded to the foot of the column and fixed to the pad with holding-down bolts. A cap plate at the top bolts to the beam above, so the two act together and the beam cannot slide off its support.
- The noisiest part is cutting the floor and digging the pad, usually a day's work. The concrete then needs time to gain strength, so the column is often fitted on a later visit once it has cured enough to take load.
- A tall, slender column can buckle under load before the steel itself is overstressed. That is why the engineer checks the height between restraints as well as the weight carried, and why a taller column may need a heavier section.
- Exposed columns are commonly protected with intumescent paint applied to the thickness the specification calls for, which keeps a slim profile. Boxed columns are clad in fire-rated plasterboard and finished with corner beads, skim and a skirting to match the room.
How the job runs in Solihull
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
We submit a building notice or full plans application to Solihull Council, so approval is in place before the wall is touched.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
Guide prices for steel columns & posts in Solihull
As a guide, budget £500–£1,500 per column including VAT for steel column or post in Solihull, based on published UK cost guides adjusted for prices in the West Midlands (no adjustment).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Steel column or post | £500–£1,500 per column | Column supplied and fitted with base and cap plates on a pad foundation |
| Structural calculations for a beam | £250–£750 | Site measure or photos, beam and padstone design and calculations for building control |
| Fire protection to a steel beam | £150–£600 per beam | Fire-rated board boxing or an intumescent coating system as specified |
| Kitchen-diner knock-through | £2,500–£6,000 | Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra) |
Figures include our approximate regional adjustment for prices in the West Midlands (no adjustment) and are rounded. How these figures are worked out.
Building control and neighbours in Solihull
Structural openings in English homes need building regulations approval before work starts. Solihull Council can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Steel columns & posts near Solihull
- Shirley 1.6 mi
- Acocks Green 2.9 mi
- Birmingham 6.8 mi
- Aston 7.3 mi
- Bartley Green 9.2 mi
- Kenilworth 9.5 mi
Local questions answered
Can you work on older or listed homes in Solihull?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
What happens at the survey visit in Solihull?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
What is the difference between a column and a padstone?
A padstone is a block bedded into a wall to spread a beam's load into the masonry beneath. A column replaces the need for a wall altogether, carrying the load down to its own foundation. Where the wall below a beam end is too weak for a padstone, the engineer may call for a column instead.
How long does it take to fit a steel post?
The column itself can often be fixed in a day, but the whole job usually spans a few working days. The floor is cut and the pad dug, building control inspects it, the concrete is poured and left to cure, and then the column goes in and is packed tight to the beam.
Can I put a steel post in the middle of a beam?
Yes, a central post is a common way to support a long beam, and it often lets the engineer specify a shallower steel. The post needs its own foundation and has to sit somewhere that works with the room layout. The engineer compares a post against a single deeper beam and specifies whichever suits the loads and the space.
Can I stay at home while the work is done in Solihull?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.