Steel BeamInstallers
Two installers seen from behind lifting a steel beam onto a padstone

RSJ installation · Speke

RSJ installation in Speke

RSJ installation for homes in L19, L24, L25, designed by a structural engineer.

  • Survey, design and installation in one
  • Covering L19, L24, L25
  • Inspected before it is covered

Free survey in Speke

Tell us about the RSJ installation job in Speke.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our RSJ installation service in Speke

We carry out RSJ installation in Speke, covering the L19, L24 and L25 postcode districts. Speke is around 7.4 miles from Liverpool, and we cover both. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.

People still call almost any steel beam in a house an RSJ, even though the sections fitted today are usually universal beams with parallel flanges. Whatever the name, the job is the same: a length of structural steel, made to an engineer's specification, carrying floors, walls or roof over a space where support used to be.

Worth knowing before you start

  • Heavy steels are raised with suitable lifting equipment rather than by hand alone. Manual handling is planned so nobody carries more than is safe, and the lift is coordinated so the beam goes up level onto both bearings together.
  • RSJ originally meant a rolled steel joist with tapered flanges. Most beams supplied for homes today are universal beams with parallel flanges, but the term RSJ has stuck, and builders, engineers and building control all understand what it means.
  • Packing is what makes the beam work. Steel shims and dry-pack mortar fill the gap between the top flange and the structure above, so the load transfers onto the steel without the floor or wall settling down onto it.
  • An RSJ inside a home commonly needs 30-minute fire resistance where it supports elements of structure. Fire-rated plasterboard boxing is the usual method, with intumescent paint used when the beam is to remain visible.
  • Floor joists can rest on the bottom flange, hang from timber packers bolted into the web, or be notched to sit over the steel. The engineer specifies the connection, and it affects how flush the finished ceiling can be.

How the job runs in Speke

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to Liverpool City Council, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

How much should I budget in Speke?

As a guide, budget £770–£2,400 per beam including VAT for rSJ supply and fit (single beam) in Speke, based on published UK cost guides adjusted for prices in the North West (-4%).

JobTypical guide rangeWhat it usually covers
RSJ supply and fit (single beam)£770–£2,400 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Temporary works and propping£140–£480Props, spreaders, needles and sole plates for a typical opening, installed and struck
Load-bearing wall removal with steel beam£1,900–£4,800Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Steel beam replacement£1,900–£5,300Propping, removing the failed beam, new steel on proper bearings, approval and making good

Figures include our approximate regional adjustment for prices in the North West (-4%) and are rounded. How these figures are worked out.

Building rules for Speke

For Speke, building control is provided by Liverpool City Council, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

RSJ installation near Speke

Local questions answered

What happens at the survey visit in Speke?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Who approves RSJ installation in Speke?

Structural work in Speke needs a building notice or full plans application to Liverpool City Council or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

What is included in an RSJ supply and fit price?

Our itemised written quote sets out the calculations, building control, steel and fabrication, delivery, lifting, padstones, propping, labour, fire protection and making good as separate lines. Once the specification and scope are agreed, the price is fixed in writing, so you know the full cost before work starts.

Can you fit an RSJ to my own engineer's calculations?

Yes. We install to calculations and drawings from your engineer or architect, as long as they cover the beam, bearings and any columns or connections. If site conditions differ from what the design assumed, we check with the engineer before carrying on.

How is an RSJ installed?

The structure above is propped, the wall or opening is prepared, and padstones are bedded at each end. The beam is lifted onto them, bolted where needed and packed with shims and dry-pack. Props come out once it is carrying, building control inspects it, and the steel is then fire protected and finished.

Can I stay at home while the work is done in Speke?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.