RSJ installation · Aberystwyth
RSJ installation in Aberystwyth
Steelwork, approvals and making good for RSJ installation in Aberystwyth and nearby.
- Survey, design and installation in one
- Covering SY23
- Inspected before it is covered
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
RSJ installation in Aberystwyth: how it works
If you live in Aberystwyth, RSJ installation can usually be planned and priced after a single survey visit. We also cover the surrounding towns and villages in Ceredigion. We cover SY23, and we fix the price in writing once the layout and scope are agreed.
We supply and fit the steel from start to finish. That includes arranging the calculations, having the beam fabricated with the right end plates, holes and primer, getting it into the property, setting it on its bearings, and packing it so it takes the load. Building control, propping and making good sit in the same itemised quote.
Key points for your project
- Delivery can make or break an RSJ job. A long beam has to turn through a front door, along a hallway and past the stairs, so routes are measured at the survey and alternatives such as a window opening are planned early.
- If you already hold calculations from an architect or engineer, we install to those. Where something on site differs from the drawing, such as a weaker wall or a different joist direction, the engineer is asked to confirm before work carries on.
- Packing is what makes the beam work. Steel shims and dry-pack mortar fill the gap between the top flange and the structure above, so the load transfers onto the steel without the floor or wall settling down onto it.
- Padstones spread the concentrated load from each beam end into the masonry below. They may be concrete, engineering brick or a steel plate, depending on the engineer's design and the strength of the wall beneath.
- Steel for internal use is normally delivered with a primer coat to protect it during installation. Beams in damp positions, within external walls or exposed outside need a more robust coating or galvanising, as the engineer specifies.
From survey to sign-off in Aberystwyth
Survey in Aberystwyth
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit the application or notice to Ceredigion County Council under the Building Regulations as they apply in Wales, before work starts.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
What does RSJ installation cost in Aberystwyth?
As a guide, budget £730–£2,280 per beam including VAT for rSJ supply and fit (single beam) in Aberystwyth, based on published UK cost guides adjusted for prices in Wales (-9%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| RSJ supply and fit (single beam) | £730–£2,280 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
| Steel goalpost frame | £1,800–£5,450 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
| Steel beam replacement | £1,800–£5,000 | Propping, removing the failed beam, new steel on proper bearings, approval and making good |
| Structural calculations for a beam | £230–£680 | Site measure or photos, beam and padstone design and calculations for building control |
Figures include our approximate regional adjustment for prices in Wales (-9%) and are rounded. How these figures are worked out.
Building control and neighbours in Aberystwyth
In Wales, structural alterations come under the Building Regulations 2010 as they apply in Wales. Ceredigion County Council handles building control for Aberystwyth. For work started or approved from 1 July 2026, the Welsh system uses an application to building control, dutyholders appointed in writing, a commencement notice before work starts and a compliance statement at the end.
Where the steel bears into a wall shared with next door, notice must be served under the Party Wall etc. Act 1996. If your neighbour dissents, surveyors agree how the work is done before it starts.
RSJ installation in Aberystwyth: your questions
What happens at the survey visit in Aberystwyth?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
Can you work on older or listed homes in Aberystwyth?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
How heavy is an RSJ and how is it lifted?
Weight varies widely with the section and length, from beams a small team can carry to steels needing mechanical lifting. The lift is planned at the survey, using enough people, trolleys and suitable lifting equipment so the beam goes up safely and level onto both bearings.
What is included in an RSJ supply and fit price?
Our itemised written quote sets out the calculations, building control, steel and fabrication, delivery, lifting, padstones, propping, labour, fire protection and making good as separate lines. Once the specification and scope are agreed, the price is fixed in writing, so you know the full cost before work starts.
Can you fit an RSJ to my own engineer's calculations?
Yes. We install to calculations and drawings from your engineer or architect, as long as they cover the beam, bearings and any columns or connections. If site conditions differ from what the design assumed, we check with the engineer before carrying on.
How soon can RSJ installation start in Aberystwyth?
Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.