Planning rear extension steels in Crawley
If you live in Crawley, rear extension steels can usually be planned and priced after a single survey visit. The wider West Sussex area is covered as well. We cover RH10 and RH11, and we fix the price in writing once the layout and scope are agreed.
We work alongside your builder or as the steel package within the wider build. We arrange the engineer's design, coordinate building control, prop and open the rear wall at the right stage of the programme, and fit and pack the steels so the extension can be finished around them.
Worth knowing before you start
- The opening is usually formed once the extension walls and roof are up, so the house stays secure and dry. Leaving it too late can hold up plastering and floor screeding, so the steel date is agreed with the builder early on.
- Two-storey rear extensions add a second level of loads to think about. Steels at first-floor level may carry the existing rear wall of the bedrooms or tie the new roof into the old one, so the engineer looks at both floors together.
- During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.
- A single beam works where solid masonry is left at both ends of the opening. Where the opening runs nearly the full width or the corners are weak, the engineer may use columns or a goalpost frame, which is two posts and a beam bolted together.
- The building control completion certificate for the extension covers the steelwork to the old rear wall. Keep it with the engineer's calculations and drawings, as a buyer's solicitor will expect to see the structural paperwork for the extension.
What happens, step by step
Free visit
A short visit to Crawley to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for rear extension steels in Crawley
As a guide, budget £2,800–£7,850 including VAT for opening into a rear extension in Crawley, based on published UK cost guides adjusted for prices in the South East (+12%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Opening into a rear extension | £2,800–£7,850 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Side return extension steelwork | £3,900–£9,500 | Beams and posts along the old side wall line, propping and approvals (extension build extra) |
| Steel goalpost frame | £2,250–£6,700 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
| Steel column or post | £560–£1,680 per column | Column supplied and fitted with base and cap plates on a pad foundation |
Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.
Approvals in Crawley
Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Rear extension steels near Crawley
- Horley 4.4 mi
- Horsham 7.2 mi
- East Grinstead 7.7 mi
- Reigate 8.6 mi
- Haywards Heath 8.7 mi
- Redhill 8.8 mi
Local questions answered
Do you also work near Crawley?
Yes. We also cover nearby towns including Horley, Horsham, East Grinstead and Reigate.
How soon can rear extension steels start in Crawley?
Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.
Will my kitchen be out of action while the rear wall is opened?
For a few days, usually. The kitchen often sits against the rear wall, so units, sinks or appliances near the opening may need disconnecting while the wall is propped and removed. The work area is sheeted off and the rest of the house stays in use.
Do I need a party wall agreement for extension steels?
In England and Wales, if a beam bears into a wall shared with a neighbour, or the extension foundations are dug close to theirs, notice under the Party Wall etc. Act 1996 is usually required. We can arrange the notices through a party wall surveyor. There is no equivalent legislation in Scotland or Northern Ireland.
How wide can a rear extension opening be?
There is no fixed limit, and openings across the full width of a house are common with the right steel. The engineer sizes the beam or frame for the span and the loads above. Wider spans need deeper or heavier steel and possibly columns, which affects headroom and cost.
Who approves rear extension steels in Crawley?
Structural work in Crawley needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.