Steel BeamInstallers
Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · Wallington

Rear extension steels in Wallington

Rear extension steels in Wallington, from free survey to completion certificate.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Wallington and nearby

Free survey in Wallington

Tell us about the rear extension steel job in Wallington.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our rear extension steels service in Wallington

For homes in Wallington and the CR4, CR8, SM1, SM2 and SM3 districts, we handle rear extension steels from survey to sign-off. We also cover the surrounding towns and villages in London. The beam is sized by a structural engineer and inspected before it is boxed in.

Building a rear extension is only half of the open-plan result. The original back wall still holds up the first floor and the rear wall of the bedrooms above, so opening it needs steel. Depending on the width and what is left to bear on, that could be a single beam on padstones, a beam on columns, or a full goalpost frame.

Things to plan for

  • Soil stacks, waste pipes, boiler flues and gas meters are often fixed to the back wall. These are moved before the wall opens, and any work on gas pipework must by law be carried out by a Gas Safe registered engineer.
  • The building control completion certificate for the extension covers the steelwork to the old rear wall. Keep it with the engineer's calculations and drawings, as a buyer's solicitor will expect to see the structural paperwork for the extension.
  • The original rear wall of most houses is load-bearing because it supports first-floor joists and the bedroom wall above. Even where the joists run parallel to it, the masonry overhead still needs carrying, so steel is almost always part of opening it up.
  • Opening the rear wall is usually the dustiest stage of an extension project. The work face is sheeted off from the rest of the house, and the kitchen is often out of use for a few days while the opening is formed and the steel goes in.
  • A single beam works where solid masonry is left at both ends of the opening. Where the opening runs nearly the full width or the corners are weak, the engineer may use columns or a goalpost frame, which is two posts and a beam bolted together.

From survey to sign-off in Wallington

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

How much should I budget in Wallington?

As a guide, budget £3,200–£8,950 including VAT for opening into a rear extension in Wallington, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£3,200–£8,950Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Steel column or post£640–£1,920 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Side return extension steelwork£4,500–£10,900Beams and posts along the old side wall line, propping and approvals (extension build extra)
Party wall surveyor (agreed surveyor, per neighbour)£1,150–£2,550 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building rules for Wallington

For Wallington, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Rear extension steels near Wallington

Local questions answered

Can I stay at home while the work is done in Wallington?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Is the steel included in the extension's building regulations?

Yes. The steelwork is part of the extension, so the engineer's calculations go to building control with the extension application and the steel is inspected before it is covered. The completion certificate issued for the extension then covers the structural work to the rear wall.

Do I need a party wall agreement for extension steels?

In England and Wales, if a beam bears into a wall shared with a neighbour, or the extension foundations are dug close to theirs, notice under the Party Wall etc. Act 1996 is usually required. We can arrange the notices through a party wall surveyor. There is no equivalent legislation in Scotland or Northern Ireland.

What is a goalpost frame in an extension?

A goalpost frame is two steel columns with a beam across the top, bolted together and standing on their own foundations. It is used where the opening is so wide that little masonry is left to bear on, or where the existing corners cannot take the load. The engineer decides whether one is needed.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.