
Rear extension steels · Shepherds Bush
Rear extension steels in Shepherds Bush
Rear extension steels for homes in SW5, W6, W8, designed by a structural engineer.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
What rear extension steels involve in Shepherds Bush
Need rear extension steels in Shepherds Bush? We also cover the surrounding towns and villages in London. We survey the property, arrange the engineer's design, deal with local building control, fit the steel and make good, all under one quote for SW5, W6, W8, W9 and W10 addresses.
Building a rear extension is only half of the open-plan result. The original back wall still holds up the first floor and the rear wall of the bedrooms above, so opening it needs steel. Depending on the width and what is left to bear on, that could be a single beam on padstones, a beam on columns, or a full goalpost frame.
What to expect
- The original rear wall of most houses is load-bearing because it supports first-floor joists and the bedroom wall above. Even where the joists run parallel to it, the masonry overhead still needs carrying, so steel is almost always part of opening it up.
- Two-storey rear extensions add a second level of loads to think about. Steels at first-floor level may carry the existing rear wall of the bedrooms or tie the new roof into the old one, so the engineer looks at both floors together.
- Opening the rear wall is usually the dustiest stage of an extension project. The work face is sheeted off from the rest of the house, and the kitchen is often out of use for a few days while the opening is formed and the steel goes in.
- The steelwork forms part of the extension's building regulations approval, and the engineer's calculations go in with it. Planning for the extension itself is separate; many rear extensions to houses in England fall within permitted development, subject to size limits and conditions.
- During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.
What happens, step by step
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
Guide prices for rear extension steels in Shepherds Bush
As a guide, budget £3,200–£8,950 including VAT for opening into a rear extension in Shepherds Bush, based on published UK cost guides adjusted for London prices (+28%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Opening into a rear extension | £3,200–£8,950 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Steel column or post | £640–£1,920 per column | Column supplied and fitted with base and cap plates on a pad foundation |
| Steel goalpost frame | £2,550–£7,700 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
| Side return extension steelwork | £4,500–£10,900 | Beams and posts along the old side wall line, propping and approvals (extension build extra) |
Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.
Building rules for Shepherds Bush
Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Rear extension steels in Shepherds Bush: your questions
Do I need a party wall agreement for rear extension steels in Shepherds Bush?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.
What happens at the survey visit in Shepherds Bush?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
Is the steel included in the extension's building regulations?
Yes. The steelwork is part of the extension, so the engineer's calculations go to building control with the extension application and the steel is inspected before it is covered. The completion certificate issued for the extension then covers the structural work to the rear wall.
What is a goalpost frame in an extension?
A goalpost frame is two steel columns with a beam across the top, bolted together and standing on their own foundations. It is used where the opening is so wide that little masonry is left to bear on, or where the existing corners cannot take the load. The engineer decides whether one is needed.
Who designs the steels for a rear extension?
A structural engineer. Your architect's drawings show the layout, but the engineer calculates the beams, columns, connections and foundations. We arrange those calculations, or work from an engineer's design you already have, and make sure the details suit the builder's programme.