Steel BeamInstallers
Plasterer seen from behind skimming a newly boxed beam

Plastering & making good · Edinburgh

Plastering & making good in Edinburgh

Calculations, approvals, propping, steel and making good for plastering & making good across Edinburgh.

  • Free survey visit in Edinburgh
  • Engineer's calculations arranged
  • Building warrant handled for you

Free survey in Edinburgh

Tell us about your plastering & making good project in Edinburgh.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What plastering & making good involves in Edinburgh

Plastering and making good is the finishing work after a beam goes in or a wall comes out: boxing the steel, fixing corner beads, patching ceilings and wall ends, infilling the floor where the wall stood and skimming everything smooth. The aim is a room that looks as if the opening was always there, ready for paint.

If you are planning plastering & making good in Edinburgh, the order of work matters as much as the steel: survey, calculations, approval, propping, installation, inspection and making good. We cover the city and its surrounding districts. We run that sequence for you as one job with one point of contact.

Key points for your project

  • Period cornicing and ceiling roses can often be repaired or run to match the existing profile. Where a wall is removed between two rooms with cornice, the ends are usually returned neatly along the new beam so the detail looks intentional.
  • Fresh plaster has to dry before it is painted. A thin skim over board in a warm, ventilated room often dries within a few days to a week, while backing coats and deeper repairs take longer. Painting too soon can cause peeling and patchy colour.
  • A boxed beam usually leaves a downstand below the ceiling line. Where a flat ceiling is wanted, the beam has to be set up into the floor void during installation, so the finish needs deciding before the steel goes in, not after.
  • Fire-rated plasterboard is used for boxing steel that needs fire protection, while standard or moisture-resistant board suits ordinary ceiling and wall repairs. Using the right board in each place avoids rework when building standards inspects.
  • When a wall is removed, a strip of floor goes with it. On suspended timber floors the gap is joisted and boarded, and on solid floors it is filled and screeded. Either way, the infill must sit level so new flooring does not show a ridge.

Four stages, one team

  1. Free visit

    A short visit to Edinburgh to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building warrant

    A building warrant is applied for from City of Edinburgh Council, and work starts only once the warrant has been granted.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What does plastering & making good cost in Edinburgh?

As a guide, budget £270–£1,090 including VAT for plastering and making good in Edinburgh, based on published UK cost guides adjusted for prices in Scotland (-9%).

JobTypical guide rangeWhat it usually covers
Plastering and making good£270–£1,090Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Load-bearing wall removal with steel beam£1,800–£4,550Typical internal wall up to about 4 m: calculations, building standards, propping, steel, padstones, fitting, fire protection and making good
Kitchen-diner knock-through£2,300–£5,450Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra)
Fire protection to a steel beam£140–£550 per beamFire-rated board boxing or an intumescent coating system as specified

Figures include our approximate regional adjustment for prices in Scotland (-9%) and are rounded. How these figures are worked out.

Approvals in Edinburgh

Scottish rules are stricter on timing than in England: the building warrant must be in place before the wall is touched. We prepare the application with the engineer's calculations and submit it to City of Edinburgh Council. The finished work is then certified and a completion certificate submitted for acceptance.

Scotland has no Party Wall Act. Work affecting a shared wall is governed by your title deeds and the general law, and in flats by the Tenements (Scotland) Act 2004, so it is sensible to agree the work with neighbours in writing before starting.

Building rules in Scotland

Questions about plastering & making good in Edinburgh

Do I need a party wall agreement for plastering & making good in Edinburgh?

There is no Party Wall Act in Scotland. Your title deeds and the general law apply instead, and the Tenements (Scotland) Act 2004 for flats, so agree the work with your neighbour in writing before it starts.

What happens at the survey visit in Edinburgh?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

How long after a knock-through can I decorate?

Once the new plaster has dried right through, which for a thin skim in a warm, ventilated room is often a few days to a week. Deeper repairs and backing coats take longer. Plaster turns from dark to an even pale colour when it is dry, and painting before then risks poor adhesion.

How do you hide a steel beam in the ceiling?

Most beams are boxed with fire-rated plasterboard fixed to a light frame, then finished with corner beads and a skim coat so they read as part of the ceiling. If you want no downstand at all, the beam has to be set into the floor void when it is installed, which is decided at the design stage.

Do I need a building warrant for plastering?

Not for plastering on its own. However, where it covers new structural steel, building standards usually needs to inspect the beam and its fire protection before it is boxed in and skimmed. That is why, on structural jobs, the making good is timed around the building standards visit.

Do you decorate after making good?

Not usually. Making good leaves surfaces skimmed, dry and ready for paint, with trims refitted, and decoration is normally left to you or your decorator so you can choose colours and finishes yourself. Whoever paints should start with a thinned mist coat on the new plaster before the main coats.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.