Chimney breast removal · Edinburgh
Chimney breast removal in Edinburgh
Calculations, approvals, propping, steel and making good for chimney breast removal across Edinburgh.
- Price fixed in writing once scope is agreed
- Building warrant arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Planning chimney breast removal in Edinburgh
Chimney breast removal is taking out the projecting brickwork that houses the flues from fireplaces, usually to gain floor space or straighten a wall. If any of the breast or stack above stays in place, it must be carried on steel or another support the engineer designs and building standards accepts, so it is never left unsupported.
If you are planning chimney breast removal in Edinburgh, the order of work matters as much as the steel: survey, calculations, approval, propping, installation, inspection and making good. That covers every postcode district in the area. We run that sequence for you as one job with one point of contact.
Worth knowing before you start
- A chimney closed off at both ends can trap moisture and cause damp patches on the walls. Where part of a flue remains, a vent at room level and a ventilated cap on the pot keep air moving through it.
- A flue still serving a gas fire, boiler or wood burner cannot be removed until that appliance is disconnected and an alternative arranged. Work on any gas appliance or pipe must, by law, be done by a Gas Safe registered engineer.
- Gallows brackets are steel angle brackets fixed into the wall to hold a breast above. They are often not accepted where the remaining masonry is heavy or sits against the neighbour's breast, so the engineer and building standards decide which support method is suitable.
- The price depends on how many floors the breast spans, whether the stack is kept or removed, the support method the engineer specifies, roof and scaffold work, and how much rubble needs taking away. Each is listed separately in the quote.
- Older fireplaces sometimes contain asbestos in flue linings, fire surrounds, hearth boards or heat-resistant panels. In buildings from before 2000, suspect materials are identified with a survey before removal so they can be handled correctly.
How the job runs in Edinburgh
Survey in Edinburgh
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building warrant
A building warrant is applied for from City of Edinburgh Council, and work starts only once the warrant has been granted.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building standards inspects it, and we make good.
Guide prices for chimney breast removal in Edinburgh
As a guide, budget £1,350–£2,750 including VAT for chimney breast removal (ground floor) in Edinburgh, based on published UK cost guides adjusted for prices in Scotland (-9%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Chimney breast removal (ground floor) | £1,350–£2,750 | Ground-floor breast removed, steel to support the breast above, building standards and making good |
| Load-bearing wall removal with steel beam | £1,800–£4,550 | Typical internal wall up to about 4 m: calculations, building standards, propping, steel, padstones, fitting, fire protection and making good |
| Loft conversion steels | £2,300–£5,450 | Supply and fit of floor and ridge steels on padstones, including lifting into the roof space |
| Plastering and making good | £270–£1,090 | Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up |
Figures include our approximate regional adjustment for prices in Scotland (-9%) and are rounded. How these figures are worked out.
Building control and neighbours in Edinburgh
Scottish rules are stricter on timing than in England: the building warrant must be in place before the wall is touched. We prepare the application with the engineer's calculations and submit it to City of Edinburgh Council. The finished work is then certified and a completion certificate submitted for acceptance.
Scotland has no Party Wall Act. Work affecting a shared wall is governed by your title deeds and the general law, and in flats by the Tenements (Scotland) Act 2004, so it is sensible to agree the work with neighbours in writing before starting.
More in Edinburgh
Local questions answered
Can I stay at home while the work is done in Edinburgh?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
Who approves chimney breast removal in Edinburgh?
Structural work in Edinburgh needs a building warrant from City of Edinburgh Council, granted before work starts. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.
How long does chimney breast removal take?
A ground-floor breast with a steel beam supporting the masonry above usually takes two to four working days, including propping, fitting the steel, removing the brickwork and basic making good. Full removal from ground floor to roof takes longer because of scaffolding, roofing work and weather, and plaster needs time to dry afterwards.
Can I remove a chimney breast downstairs and keep the fireplace upstairs?
Usually, as long as the upstairs breast and its flue stay intact and are carried on a support the engineer designs for that load. Building standards must approve the arrangement. If the upstairs fireplace has a gas fire, any work on it or its supply must be carried out by a Gas Safe registered engineer.
Can I remove a chimney breast on the ground floor only?
Yes, but whatever stays above must be properly supported. The structural engineer designs that support, usually a steel beam bearing onto walls that can take the load, and building standards must approve it before work starts. Leaving an upper breast or stack without adequate support is dangerous and is a problem surveyors look for.
Will removing a chimney breast cause damp?
It can if the remaining flue is sealed with no airflow, because moisture and condensation get trapped inside. Fitting a vent in the remaining breast or wall and a ventilated cap on the chimney pot keeps air moving. If the stack is removed and the roof made good, the risk from the flue goes away.