Steel BeamInstallers
Victorian house mid-conversion into flats with new steel beams and stud walls

Flat & HMO conversion steels · Reigate

Flat & HMO conversion steels in Reigate

Flat & HMO conversion steels in Reigate, from free survey to completion certificate.

  • Survey, design and installation in one
  • Covering RH1, RH2
  • Inspected before it is covered

Free survey in Reigate

Tell us about the flat & HMO conversion steel job in Reigate.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Flat & HMO conversion steels in Reigate: how it works

Our flat & HMO conversion steels service in Reigate covers everything from the first visit to the completion paperwork. Reigate is around 8.6 miles from Crawley, and we cover both. Postcode districts we cover here include RH1 and RH2.

We supply and install steelwork for landlords, developers and their builders, working from the engineer's design and fitting in with the wider conversion. We arrange structural calculations, handle building control for the structural work or feed into your existing application, and fire protect the steel to the period the scheme requires.

Key points for your project

  • Keep the structural calculations, building control completion certificate and fire protection records together in one place. They are needed for signing off the conversion, and buyers, lenders and licensing officers may ask to see them later.
  • Where the building is leasehold, or an existing flat is being altered, the freeholder's written consent is normally needed for structural changes. Lenders may also want to see building control sign-off before releasing funds on a converted property.
  • Costs reflect how many walls move, the number of beams and columns, access for lifting steel to upper floors, the fire period required, phasing around other trades and whether existing foundations can take the new concentrated loads.
  • Converting a house into flats is treated as a material change of use for building regulations purposes, so fire safety, sound insulation and other requirements apply across the building, not just to the structural work. The steelwork forms one part of that wider approval.
  • Conversions add kitchens and bathrooms upstairs, so soil pipes, water supplies and extract ducts need routes through the structure. Steel and joist positions are coordinated with these runs, and steel should never be drilled or notched on site without the engineer's approval.

What happens, step by step

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for flat & HMO conversion steels in Reigate

As a guide, budget £2,800–£10,100 including VAT for steelwork for a flat or HMO conversion in Reigate, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Steelwork for a flat or HMO conversion£2,800–£10,100Beams and posts for a revised layout, with approvals; fire and sound separation priced with the conversion
Load-bearing wall removal with steel beam£2,250–£5,600Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Fire protection to a steel beam£170–£670 per beamFire-rated board boxing or an intumescent coating system as specified
Steel column or post£560–£1,680 per columnColumn supplied and fitted with base and cap plates on a pad foundation

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for Reigate

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Flat & HMO conversion steels near Reigate

Local questions answered

Can you work on older or listed homes in Reigate?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Do I need a party wall agreement for flat & HMO conversion steels in Reigate?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Does steel in a flat conversion need fire protection?

Yes, in almost all cases. Steel holding up floors that separate flats, or supporting escape routes, needs fire resistance to the period the scheme requires, which can be higher than in a single house. It is usually boxed with fire-rated board or coated with intumescent paint, and building control inspects it before handover.

Do I need an HMO licence before converting a house?

Possibly. Many HMOs need a licence from the local council, and some areas license smaller HMOs too. Licensing covers room sizes, amenities and fire safety, and it is separate from planning and building regulations. Check the council's requirements early, as they can affect the layout and therefore the steelwork needed.

Can you install the steel while my main contractor runs the conversion?

Yes. On many conversions the steelwork is installed as a package within a wider build, working to the main contractor's programme and the engineer's design. We coordinate propping, deliveries and building control inspections for the steel so the other trades can follow on smoothly once it is in.

Do you cover Reigate for flat & HMO conversion steels?

Yes. We carry out flat & HMO conversion steels in Reigate and the RH1 and RH2 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.