Steel BeamInstallers
Victorian house mid-conversion into flats with new steel beams and stud walls

Flat & HMO conversion steels · Feltham

Flat & HMO conversion steels in Feltham

Steelwork, approvals and making good for flat & HMO conversion steels in Feltham and nearby.

  • Survey, design and installation in one
  • Covering TW2, TW3, TW4
  • Inspected before it is covered

Free survey in Feltham

Tell us about the flat & HMO conversion steel job in Feltham.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our flat & HMO conversion steels service in Feltham

We cover flat & HMO conversion steels in Feltham (TW2, TW3, TW4) and the streets around it. We also cover the surrounding towns and villages in London. Each job is designed by a structural engineer and approved through local building control before work begins.

We supply and install steelwork for landlords, developers and their builders, working from the engineer's design and fitting in with the wider conversion. We arrange structural calculations, handle building control for the structural work or feed into your existing application, and fire protect the steel to the period the scheme requires.

What to expect

  • In a conversion, walls that carried load are often taken out to form open kitchens or wider corridors, while new partitions go in elsewhere. Each change is checked, because a new stud wall standing on old joists can add load the floor was never designed for.
  • A conversion to flats or an HMO may need planning permission for the change of use, depending on the scheme, its size and any local restrictions. Checking the planning position before design work begins avoids redesigning the layout and its steel later.
  • Floors and walls between flats must resist the spread of fire, and steel holding up those floors needs protection to match. Where a beam passes through a separating wall or floor, the gaps around it are fire-stopped so the separation stays continuous.
  • Where the building is leasehold, or an existing flat is being altered, the freeholder's written consent is normally needed for structural changes. Lenders may also want to see building control sign-off before releasing funds on a converted property.
  • Keep the structural calculations, building control completion certificate and fire protection records together in one place. They are needed for signing off the conversion, and buyers, lenders and licensing officers may ask to see them later.

From survey to sign-off in Feltham

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

What do flat & HMO conversion steels cost in Feltham?

As a guide, budget £3,200–£11,500 including VAT for steelwork for a flat or HMO conversion in Feltham, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Steelwork for a flat or HMO conversion£3,200–£11,500Beams and posts for a revised layout, with approvals; fire and sound separation priced with the conversion
Fire protection to a steel beam£190–£770 per beamFire-rated board boxing or an intumescent coating system as specified
Loft conversion steels£3,200–£7,700Supply and fit of floor and ridge steels on padstones, including lifting into the roof space
Building control fees£320–£830Building notice or full plans fee and inspections; varies by council or approver

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building control and neighbours in Feltham

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Flat & HMO conversion steels near Feltham

Questions about flat & HMO conversion steels in Feltham

Who approves flat & HMO conversion steels in Feltham?

Structural work in Feltham needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Do you cover Feltham for flat & HMO conversion steels?

Yes. We carry out flat & HMO conversion steels in Feltham and the TW2, TW3, TW4, TW5 and TW6 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Can you install the steel while my main contractor runs the conversion?

Yes. On many conversions the steelwork is installed as a package within a wider build, working to the main contractor's programme and the engineer's design. We coordinate propping, deliveries and building control inspections for the steel so the other trades can follow on smoothly once it is in.

What steel beams are needed for a flat conversion?

It depends on how much the layout changes. Typical steelwork includes beams where load-bearing walls are removed, trimmers around new stair openings, and columns or frames where loads have to come down through the building. A structural engineer designs each element from the new layout and the existing structure, and the calculations go to building control.

How long does the steelwork take on a house-to-flats conversion?

Typically one to three weeks on site, depending on how many walls move and how the work is phased. The steel is usually among the first structural stages, so it is programmed early to let partitions, services and fire separation follow. The full conversion takes considerably longer than the steelwork alone.

Do you also work near Feltham?

Yes. We also cover nearby towns including Hanworth, Ashford, Hounslow and Sunbury-on-Thames.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.