Steel BeamInstallers
Steel beam half boxed in pink fire-rated plasterboard

Fire protection for steel beams · West Yorkshire

Fire protection for steel beams in West Yorkshire

Survey, engineer's design and installation of fire protection for steel beams anywhere in West Yorkshire.

  • Survey, design and installation in one
  • Covering BD1, BD10, BD11, BD12
  • Inspected before it is covered

Free survey in West Yorkshire

Tell us about your fire protection for steel beams project in West Yorkshire.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Fire protection for steel beams in West Yorkshire: how it works

Fire protection for steel beams is the layer of fire-rated board or intumescent coating applied to structural steel so it keeps its strength long enough in a fire for people to get out. Steel softens as it heats, so building regulations set a period of fire resistance for beams and columns, and the protection is chosen and applied to meet that period.

Looking for fire protection for steel beams in West Yorkshire? We can survey in places such as Leeds, Yeadon and Castleford and the villages around them. Our teams handle the calculations, the building control approval, the propping and the steel itself, and leave the opening ready for plastering and decoration.

Key points for your project

  • Intumescent paint looks like an ordinary coating but swells into a thick insulating char when heated. How well it performs depends on the dry film thickness, which varies with the steel section and fire period, so it is applied to a written specification.
  • Building control treats fire protection as part of the structural approval, not an optional extra. If unprotected steel is found at inspection, the completion certificate is normally held back until the protection is in place and has been checked.
  • Boxing is generally the lower-cost route for steel that will be hidden. Intumescent coatings cost more because of the product and the number of coats, and the price rises with the fire period and the size of the section.
  • Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
  • Steel does not burn, but it loses stiffness and strength as it heats. Protection is there to keep the temperature of the beam down for a set period, so the floor or walls it carries stay up while people leave.

What happens, step by step

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

What does fire protection for steel beams cost in West Yorkshire?

As a guide, budget £140–£570 per beam including VAT for fire protection to a steel beam in West Yorkshire, based on published UK cost guides adjusted for prices in Yorkshire and the Humber (-5%).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£140–£570 per beamFire-rated board boxing or an intumescent coating system as specified
RSJ supply and fit (single beam)£760–£2,380 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Plastering and making good£280–£1,140Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Steel beam replacement£1,900–£5,200Propping, removing the failed beam, new steel on proper bearings, approval and making good

Figures include our approximate regional adjustment for prices in Yorkshire and the Humber (-5%) and are rounded. How these figures are worked out.

Building rules for West Yorkshire

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Questions about fire protection for steel beams in West Yorkshire

Which towns in West Yorkshire do you cover?

We cover towns including Leeds, Bradford, Huddersfield and Wakefield, plus the villages and smaller towns around them.

What happens at the survey visit in West Yorkshire?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

How long does intumescent paint take to apply?

Several days in most cases. Each coat has to dry before the next is applied, and the number of coats depends on the thickness needed. Cold or damp rooms slow drying, so the space is kept warm and ventilated, and the top coat goes on once the full build has been measured.

What is intumescent paint for steel beams?

Intumescent paint is a fire-protective coating that swells when heated, forming a thick insulating layer that slows the steel heating up. It lets you leave a beam on show while still meeting fire requirements. It must be applied at a specified thickness over a compatible primer, so it goes on to a written specification rather than like ordinary paint.

My steel beam was fitted years ago without fire protection. What should I do?

Have it looked at and protected to current requirements. Unprotected steel can raise questions when you sell, and if the original work was never approved, a regularisation application to building control may be needed in England and Wales. We can survey the steel and price both the protection and the paperwork route.

Does a steel beam in a house need fire protection?

Usually, yes. Where a steel beam or column holds up part of the structure, building regulations normally require it to resist fire for a set period, commonly 30 minutes in a typical house. Building control confirms what is needed for your property, and the protection is checked before the work is signed off.

How much does fire protection for steel beams cost in West Yorkshire?

As a guide, budget £140–£570 per beam including VAT for fire protection to a steel beam in West Yorkshire, based on published UK cost guides adjusted for prices in Yorkshire and the Humber (-5%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.