Steel BeamInstallers
Steel beam half boxed in pink fire-rated plasterboard

Fire protection for steel beams · Newcastle under Lyme

Fire protection for steel beams in Newcastle under Lyme

Steelwork, approvals and making good for fire protection for steel beams in Newcastle under Lyme and nearby.

  • Survey, design and installation in one
  • Covering ST5
  • Inspected before it is covered

Free survey in Newcastle under Lyme

Tell us about the fire protection for steel beams job in Newcastle under Lyme.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning fire protection for steel beams in Newcastle under Lyme

We cover fire protection for steel beams in Newcastle under Lyme (ST5) and the streets around it. Newcastle under Lyme is around 2.0 miles from Stoke-on-Trent, and we cover both. Each job is designed by a structural engineer and approved through local building control before work begins.

A bare steel beam is strong at room temperature but loses much of its load-carrying capacity once it gets hot enough in a fire. If that beam holds up a floor or the walls above, it matters to everyone in the building. Fire protection slows the rate at which the steel heats up, buying time for people to get out safely.

Things to plan for

  • Boarding is fairly clean work, but coatings need a clean, dry and well-ventilated room at a suitable temperature. Dust from other trades can spoil the surface, so painting is normally scheduled once the messy work in that room is finished.
  • The fire resistance needed depends on the building and where the steel sits. In a typical two-storey house, elements of structure commonly need 30 minutes, but taller homes, flats and commercial premises can need more. The engineer and building control confirm the figure.
  • Intumescent paint looks like an ordinary coating but swells into a thick insulating char when heated. How well it performs depends on the dry film thickness, which varies with the steel section and fire period, so it is applied to a written specification.
  • Exposed steel is popular in open-plan kitchens and loft spaces. An intumescent system can take a decorative top coat in most colours, although up close the finish has a slightly textured look compared with steel painted in a factory.
  • Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.

What happens, step by step

  1. Free visit

    A short visit to Newcastle under Lyme to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

Guide prices for fire protection for steel beams in Newcastle under Lyme

As a guide, budget £150–£600 per beam including VAT for fire protection to a steel beam in Newcastle under Lyme, based on published UK cost guides adjusted for prices in the West Midlands (no adjustment).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£150–£600 per beamFire-rated board boxing or an intumescent coating system as specified
Building control fees£250–£650Building notice or full plans fee and inspections; varies by council or approver
Plastering and making good£300–£1,200Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Steel column or post£500–£1,500 per columnColumn supplied and fitted with base and cap plates on a pad foundation

Figures include our approximate regional adjustment for prices in the West Midlands (no adjustment) and are rounded. How these figures are worked out.

Approvals in Newcastle under Lyme

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Fire protection for steel beams near Newcastle under Lyme

Fire protection for steel beams in Newcastle under Lyme: your questions

How much does fire protection for steel beams cost in Newcastle under Lyme?

As a guide, budget £150–£600 per beam including VAT for fire protection to a steel beam in Newcastle under Lyme, based on published UK cost guides adjusted for prices in the West Midlands (no adjustment). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

What happens at the survey visit in Newcastle under Lyme?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Will building control check the fire protection on my beam?

Yes. Building control looks at fire protection as part of the structural work, normally at or before the final inspection. For boxing they may want to see the board before it is skimmed, and for coatings they may ask for the product details and thickness readings. We keep these records ready for them.

Is boxing in a steel beam cheaper than intumescent paint?

Usually, yes. Boxing with fire-rated plasterboard tends to cost less for steel that will be hidden. Intumescent coatings generally cost more because of the product and the number of coats needed, but they let the beam stay visible. Where either method would work, both can be priced on the itemised quote so you can compare.

How thick does intumescent paint need to be on a steel beam?

There is no single figure. The thickness depends on the steel section, how many sides are exposed and the fire period required, and the coating manufacturer's data sets the dry film thickness for each case. The applied thickness is measured with a gauge once the coats have dried and recorded for building control.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.