Steel BeamInstallers
Steel beam half boxed in pink fire-rated plasterboard

Fire protection for steel beams · Kelso

Fire protection for steel beams in Kelso

Steelwork, approvals and making good for fire protection for steel beams in Kelso and nearby.

  • Free survey visit in Kelso
  • Engineer's calculations arranged
  • Building warrant handled for you

Free survey in Kelso

Tell us about the fire protection for steel beams job in Kelso.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning fire protection for steel beams in Kelso

If you live in Kelso, fire protection for steel beams can usually be planned and priced after a single survey visit. We also cover the surrounding towns and villages in the Scottish Borders. We cover TD5, and we fix the price in writing once the layout and scope are agreed.

We fit fire protection alongside new steelwork, and as a standalone job where steel was installed without it or building standards has asked for more. That covers boxing with fire-rated plasterboard, intumescent coatings for steel left on show, and the records building standards needs to see before signing the work off.

Things to plan for

  • Building standards treats fire protection as part of the structural approval, not an optional extra. If unprotected steel is found at inspection, the completion certificate is normally held back until the protection is in place and has been checked.
  • Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
  • Boxing is generally the lower-cost route for steel that will be hidden. Intumescent coatings cost more because of the product and the number of coats, and the price rises with the fire period and the size of the section.
  • Older homes sometimes have steel fitted decades ago with no protection at all, or boxed in ordinary timber and hardboard. When this turns up during other work, we can check what is there and price protection to suit today's requirements.
  • The fire resistance needed depends on the building and where the steel sits. In a typical two-storey house, elements of structure commonly need 30 minutes, but taller homes, flats and commercial premises can need more. The engineer and building standards confirm the figure.

Four stages, one team

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building warrant

    A building warrant is applied for from Scottish Borders Council, and work starts only once the warrant has been granted.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

How much should I budget in Kelso?

As a guide, budget £140–£550 per beam including VAT for fire protection to a steel beam in Kelso, based on published UK cost guides adjusted for prices in Scotland (-9%).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£140–£550 per beamFire-rated board boxing or an intumescent coating system as specified
Plastering and making good£270–£1,090Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Building warrant fee£215–£435Statutory fee set by the estimated value of the work: £215 up to £5,000, rising on a sliding scale (fees from 1 April 2026)
Steel column or post£460–£1,360 per columnColumn supplied and fitted with base and cap plates on a pad foundation

Figures include our approximate regional adjustment for prices in Scotland (-9%) and are rounded. How these figures are worked out.

Building control and neighbours in Kelso

Steel beam work in Kelso needs a building warrant from Scottish Borders Council. The structural design is part of the application, and the council's building standards team accepts the completion certificate once the work is done as approved.

There is no party wall notice system in Scotland. Instead, check your title deeds and, for flats, the tenement management scheme, and talk to neighbours early if the beam bears into a shared wall.

Building rules in Scotland

Fire protection for steel beams near Kelso

Local questions answered

Do you cover Kelso for fire protection for steel beams?

Yes. We carry out fire protection for steel beams in Kelso and the TD5 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Can I stay at home while the work is done in Kelso?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Can I box in a steel beam with normal plasterboard?

Not where fire protection is required. Standard plasterboard is not designed to protect steel for a set period in a fire. Fire-rated plasterboard is used instead, fixed in the number of layers and with the fixings the system specifies, so the boxing performs as intended and passes when building standards checks it.

Can I put downlights in a boxed-in steel beam?

Only with planning. Cutting holes in fire boarding can weaken its protection, so any lights in or near the boxing need to be designed in, using fire-rated fittings or suitable fire-stopping where the board is pierced. It is far easier to sort this out before the boxing goes up than to adapt it afterwards.

How thick does intumescent paint need to be on a steel beam?

There is no single figure. The thickness depends on the steel section, how many sides are exposed and the fire period required, and the coating manufacturer's data sets the dry film thickness for each case. The applied thickness is measured with a gauge once the coats have dried and recorded for building standards.

What happens at the survey visit in Kelso?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.