Steel BeamInstallers
Steel beam half boxed in pink fire-rated plasterboard

Fire protection for steel beams · Heswall

Fire protection for steel beams in Heswall

Steelwork, approvals and making good for fire protection for steel beams in Heswall and nearby.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Heswall and nearby

Free survey in Heswall

Tell us about the fire protection for steel beams job in Heswall.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our fire protection for steel beams service in Heswall

Planning fire protection for steel beams in Heswall? Our team covers CH60 and CH61 and the streets around them. It sits about 5.7 miles from Birkenhead, which we also cover. You get one written quote for the calculations, approvals, propping, steel and making good.

A bare steel beam is strong at room temperature but loses much of its load-carrying capacity once it gets hot enough in a fire. If that beam holds up a floor or the walls above, it matters to everyone in the building. Fire protection slows the rate at which the steel heats up, buying time for people to get out safely.

Things to plan for

  • Building control treats fire protection as part of the structural approval, not an optional extra. If unprotected steel is found at inspection, the completion certificate is normally held back until the protection is in place and has been checked.
  • A common fault is applying intumescent paint over the wrong primer, or over one of unknown type. The products must be compatible, so where steel was primed long ago the primer is identified or the surface is cleaned back before coating.
  • Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
  • Intumescent paint looks like an ordinary coating but swells into a thick insulating char when heated. How well it performs depends on the dry film thickness, which varies with the steel section and fire period, so it is applied to a written specification.
  • The fire resistance needed depends on the building and where the steel sits. In a typical two-storey house, elements of structure commonly need 30 minutes, but taller homes, flats and commercial premises can need more. The engineer and building control confirm the figure.

What happens, step by step

  1. Free visit

    A short visit to Heswall to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to Wirral Council, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What does fire protection for steel beams cost in Heswall?

As a guide, budget £140–£580 per beam including VAT for fire protection to a steel beam in Heswall, based on published UK cost guides adjusted for prices in the North West (-4%).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£140–£580 per beamFire-rated board boxing or an intumescent coating system as specified
Steel beam replacement£1,900–£5,300Propping, removing the failed beam, new steel on proper bearings, approval and making good
Plastering and making good£290–£1,150Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Building control fees£240–£620Building notice or full plans fee and inspections; varies by council or approver

Figures include our approximate regional adjustment for prices in the North West (-4%) and are rounded. How these figures are worked out.

Approvals in Heswall

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Wirral Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Fire protection for steel beams near Heswall

Local questions answered

What happens at the survey visit in Heswall?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Do you also work near Heswall?

Yes. We also cover nearby towns including Bebington, Birkenhead, Wallasey and Liverpool.

Will building control check the fire protection on my beam?

Yes. Building control looks at fire protection as part of the structural work, normally at or before the final inspection. For boxing they may want to see the board before it is skimmed, and for coatings they may ask for the product details and thickness readings. We keep these records ready for them.

What is intumescent paint for steel beams?

Intumescent paint is a fire-protective coating that swells when heated, forming a thick insulating layer that slows the steel heating up. It lets you leave a beam on show while still meeting fire requirements. It must be applied at a specified thickness over a compatible primer, so it goes on to a written specification rather than like ordinary paint.

Is boxing in a steel beam cheaper than intumescent paint?

Usually, yes. Boxing with fire-rated plasterboard tends to cost less for steel that will be hidden. Intumescent coatings generally cost more because of the product and the number of coats needed, but they let the beam stay visible. Where either method would work, both can be priced on the itemised quote so you can compare.

Do I need a party wall agreement for fire protection for steel beams in Heswall?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.