Fire protection for steel beams · Bexley
Fire protection for steel beams in Bexley
Fire protection for steel beams in Bexley, from free survey to completion certificate.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Fire protection for steel beams in Bexley: how it works
Fire protection for steel beams in Bexley is planned around the house, not a standard kit. The wider London area is covered as well. We visit, measure and check what the wall carries, then arrange calculations and building control approval before any steel is ordered.
We fit fire protection alongside new steelwork, and as a standalone job where steel was installed without it or building control has asked for more. That covers boxing with fire-rated plasterboard, intumescent coatings for steel left on show, and the records building control needs to see before signing the work off.
What to expect
- Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
- The fire resistance needed depends on the building and where the steel sits. In a typical two-storey house, elements of structure commonly need 30 minutes, but taller homes, flats and commercial premises can need more. The engineer and building control confirm the figure.
- Fire-rated plasterboard is denser than standard board and contains additives that slow the passage of heat. It usually has a pink or red face, and the number of layers and fixing pattern come from the system specification rather than being decided on site.
- Damaged boxing or chipped intumescent paint should be repaired properly, not patched with ordinary filler. Small chips in a coating can usually be touched up with the same system, while a dented or holed box may need that board section replaced.
- Exposed steel is popular in open-plan kitchens and loft spaces. An intumescent system can take a decorative top coat in most colours, although up close the finish has a slightly textured look compared with steel painted in a factory.
What happens, step by step
Survey in Bexley
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
How much should I budget in Bexley?
As a guide, budget £190–£770 per beam including VAT for fire protection to a steel beam in Bexley, based on published UK cost guides adjusted for London prices (+28%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Fire protection to a steel beam | £190–£770 per beam | Fire-rated board boxing or an intumescent coating system as specified |
| Structural calculations for a beam | £320–£960 | Site measure or photos, beam and padstone design and calculations for building control |
| Steel column or post | £640–£1,920 per column | Column supplied and fitted with base and cap plates on a pad foundation |
| RSJ supply and fit (single beam) | £1,000–£3,200 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.
Approvals in Bexley
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Fire protection for steel beams near Bexley
- Welling 2.3 mi
- Dartford 2.8 mi
- Swanley 3.2 mi
- Eltham 4.2 mi
- Thamesmead 4.5 mi
- Blackheath 6.3 mi
Fire protection for steel beams in Bexley: your questions
Can I stay at home while the work is done in Bexley?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
Do you also work near Bexley?
Yes. We also cover nearby towns including Welling, Dartford, Swanley and Eltham.
Does a steel beam in a house need fire protection?
Usually, yes. Where a steel beam or column holds up part of the structure, building regulations normally require it to resist fire for a set period, commonly 30 minutes in a typical house. Building control confirms what is needed for your property, and the protection is checked before the work is signed off.
Is boxing in a steel beam cheaper than intumescent paint?
Usually, yes. Boxing with fire-rated plasterboard tends to cost less for steel that will be hidden. Intumescent coatings generally cost more because of the product and the number of coats needed, but they let the beam stay visible. Where either method would work, both can be priced on the itemised quote so you can compare.
Can I box in a steel beam with normal plasterboard?
Not where fire protection is required. Standard plasterboard is not designed to protect steel for a set period in a fire. Fire-rated plasterboard is used instead, fixed in the number of layers and with the fixings the system specifies, so the boxing performs as intended and passes when building control checks it.
What happens at the survey visit in Bexley?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.