About our fire protection for steel beams service in Gravesend
For homes in Gravesend and the DA10, DA11 and DA12 districts, we handle fire protection for steel beams from survey to sign-off. It sits about 8.5 miles from Gillingham, which we also cover. The beam is sized by a structural engineer and inspected before it is boxed in.
We fit fire protection alongside new steelwork, and as a standalone job where steel was installed without it or building control has asked for more. That covers boxing with fire-rated plasterboard, intumescent coatings for steel left on show, and the records building control needs to see before signing the work off.
Things to plan for
- Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
- Keep a record of what was fitted: the board type and number of layers, or the coating product, thickness readings and number of coats. Building control may ask for it, and it helps answer queries when the house is sold.
- Damaged boxing or chipped intumescent paint should be repaired properly, not patched with ordinary filler. Small chips in a coating can usually be touched up with the same system, while a dented or holed box may need that board section replaced.
- Older homes sometimes have steel fitted decades ago with no protection at all, or boxed in ordinary timber and hardboard. When this turns up during other work, we can check what is there and price protection to suit today's requirements.
- The fire resistance needed depends on the building and where the steel sits. In a typical two-storey house, elements of structure commonly need 30 minutes, but taller homes, flats and commercial premises can need more. The engineer and building control confirm the figure.
From survey to sign-off in Gravesend
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
Guide prices for fire protection for steel beams in Gravesend
As a guide, budget £170–£670 per beam including VAT for fire protection to a steel beam in Gravesend, based on published UK cost guides adjusted for prices in the South East (+12%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Fire protection to a steel beam | £170–£670 per beam | Fire-rated board boxing or an intumescent coating system as specified |
| RSJ supply and fit (single beam) | £900–£2,800 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
| Steel column or post | £560–£1,680 per column | Column supplied and fitted with base and cap plates on a pad foundation |
| Plastering and making good | £340–£1,340 | Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up |
Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.
Building rules for Gravesend
For Gravesend, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Fire protection for steel beams near Gravesend
- Grays 3.0 mi
- Strood 5.7 mi
- South Ockendon 5.9 mi
- Stanford-le-Hope 6.2 mi
- Dartford 6.8 mi
- Rochester 6.9 mi
Local questions answered
Do you also work near Gravesend?
Yes. We also cover nearby towns including Grays, Strood, South Ockendon and Stanford-le-Hope.
Can I stay at home while the work is done in Gravesend?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
Does a steel beam in a house need fire protection?
Usually, yes. Where a steel beam or column holds up part of the structure, building regulations normally require it to resist fire for a set period, commonly 30 minutes in a typical house. Building control confirms what is needed for your property, and the protection is checked before the work is signed off.
Does a steel column need fire protection as well as the beam?
Usually, if the column is part of the load path. A column carrying a beam is just as important in a fire, so it normally needs the same fire resistance. Columns are often boxed with board or coated with intumescent paint, and the engineer's design and building control confirm what applies to yours.
My steel beam was fitted years ago without fire protection. What should I do?
Have it looked at and protected to current requirements. Unprotected steel can raise questions when you sell, and if the original work was never approved, a regularisation application to building control may be needed in England and Wales. We can survey the steel and price both the protection and the paperwork route.
What happens at the survey visit in Gravesend?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.