Fire protection for steel beams in Andover
Fire protection for steel beams in Andover, from free survey to completion certificate.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Planning fire protection for steel beams in Andover
Andover has a mix of housing, and fire protection for steel beams needs a slightly different approach in each. The wider Hampshire area is covered as well. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.
We fit fire protection alongside new steelwork, and as a standalone job where steel was installed without it or building control has asked for more. That covers boxing with fire-rated plasterboard, intumescent coatings for steel left on show, and the records building control needs to see before signing the work off.
What to expect
- Keep a record of what was fitted: the board type and number of layers, or the coating product, thickness readings and number of coats. Building control may ask for it, and it helps answer queries when the house is sold.
- Damaged boxing or chipped intumescent paint should be repaired properly, not patched with ordinary filler. Small chips in a coating can usually be touched up with the same system, while a dented or holed box may need that board section replaced.
- A common fault is applying intumescent paint over the wrong primer, or over one of unknown type. The products must be compatible, so where steel was primed long ago the primer is identified or the surface is cleaned back before coating.
- The fire resistance needed depends on the building and where the steel sits. In a typical two-storey house, elements of structure commonly need 30 minutes, but taller homes, flats and commercial premises can need more. The engineer and building control confirm the figure.
- Exposed steel is popular in open-plan kitchens and loft spaces. An intumescent system can take a decorative top coat in most colours, although up close the finish has a slightly textured look compared with steel painted in a factory.
What happens, step by step
Survey in Andover
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
Guide prices for fire protection for steel beams in Andover
As a guide, budget £170–£670 per beam including VAT for fire protection to a steel beam in Andover, based on published UK cost guides adjusted for prices in the South East (+12%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Fire protection to a steel beam | £170–£670 per beam | Fire-rated board boxing or an intumescent coating system as specified |
| Plastering and making good | £340–£1,340 | Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up |
| RSJ supply and fit (single beam) | £900–£2,800 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
| Steel column or post | £560–£1,680 per column | Column supplied and fitted with base and cap plates on a pad foundation |
Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.
Building control and neighbours in Andover
For Andover, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Fire protection for steel beams near Andover
- Winchester 12.6 mi
- Newbury 15.0 mi
- Salisbury 16.4 mi
- Thatcham 16.7 mi
- Basingstoke 18.0 mi
- Eastleigh 18.0 mi
Questions about fire protection for steel beams in Andover
How much does fire protection for steel beams cost in Andover?
As a guide, budget £170–£670 per beam including VAT for fire protection to a steel beam in Andover, based on published UK cost guides adjusted for prices in the South East (+12%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.
Do I need a party wall agreement for fire protection for steel beams in Andover?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.
What is intumescent paint for steel beams?
Intumescent paint is a fire-protective coating that swells when heated, forming a thick insulating layer that slows the steel heating up. It lets you leave a beam on show while still meeting fire requirements. It must be applied at a specified thickness over a compatible primer, so it goes on to a written specification rather than like ordinary paint.
Will building control check the fire protection on my beam?
Yes. Building control looks at fire protection as part of the structural work, normally at or before the final inspection. For boxing they may want to see the board before it is skimmed, and for coatings they may ask for the product details and thickness readings. We keep these records ready for them.
How long does intumescent paint take to apply?
Several days in most cases. Each coat has to dry before the next is applied, and the number of coats depends on the thickness needed. Cold or damp rooms slow drying, so the space is kept warm and ventilated, and the top coat goes on once the full build has been measured.
Can you work on older or listed homes in Andover?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.