Steel BeamInstallers
Steel beam half boxed in pink fire-rated plasterboard

Fire protection for steel beams · Hastings

Fire protection for steel beams in Hastings

Fire protection for steel beams in Hastings, from free survey to completion certificate.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Hastings

Tell us about the fire protection for steel beams job in Hastings.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning fire protection for steel beams in Hastings

If you live in Hastings, fire protection for steel beams can usually be planned and priced after a single survey visit. We also cover the surrounding towns and villages in East Sussex. We cover TN34, TN35, TN37 and TN38, and we fix the price in writing once the layout and scope are agreed.

A bare steel beam is strong at room temperature but loses much of its load-carrying capacity once it gets hot enough in a fire. If that beam holds up a floor or the walls above, it matters to everyone in the building. Fire protection slows the rate at which the steel heats up, buying time for people to get out safely.

What to expect

  • Fire-rated plasterboard is denser than standard board and contains additives that slow the passage of heat. It usually has a pink or red face, and the number of layers and fixing pattern come from the system specification rather than being decided on site.
  • Boxing is generally the lower-cost route for steel that will be hidden. Intumescent coatings cost more because of the product and the number of coats, and the price rises with the fire period and the size of the section.
  • Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
  • Keep a record of what was fitted: the board type and number of layers, or the coating product, thickness readings and number of coats. Building control may ask for it, and it helps answer queries when the house is sold.
  • Older homes sometimes have steel fitted decades ago with no protection at all, or boxed in ordinary timber and hardboard. When this turns up during other work, we can check what is there and price protection to suit today's requirements.

Four stages, one team

  1. Free visit

    A short visit to Hastings to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

How much should I budget in Hastings?

As a guide, budget £170–£670 per beam including VAT for fire protection to a steel beam in Hastings, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£170–£670 per beamFire-rated board boxing or an intumescent coating system as specified
Plastering and making good£340–£1,340Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
RSJ supply and fit (single beam)£900–£2,800 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Steel beam replacement£2,250–£6,150Propping, removing the failed beam, new steel on proper bearings, approval and making good

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Approvals in Hastings

For Hastings, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Fire protection for steel beams near Hastings

Questions about fire protection for steel beams in Hastings

Do you cover Hastings for fire protection for steel beams?

Yes. We carry out fire protection for steel beams in Hastings and the TN34, TN35, TN37 and TN38 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

How much does fire protection for steel beams cost in Hastings?

As a guide, budget £170–£670 per beam including VAT for fire protection to a steel beam in Hastings, based on published UK cost guides adjusted for prices in the South East (+12%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Does a steel beam in a house need fire protection?

Usually, yes. Where a steel beam or column holds up part of the structure, building regulations normally require it to resist fire for a set period, commonly 30 minutes in a typical house. Building control confirms what is needed for your property, and the protection is checked before the work is signed off.

What is intumescent paint for steel beams?

Intumescent paint is a fire-protective coating that swells when heated, forming a thick insulating layer that slows the steel heating up. It lets you leave a beam on show while still meeting fire requirements. It must be applied at a specified thickness over a compatible primer, so it goes on to a written specification rather than like ordinary paint.

How long does intumescent paint take to apply?

Several days in most cases. Each coat has to dry before the next is applied, and the number of coats depends on the thickness needed. Cold or damp rooms slow drying, so the space is kept warm and ventilated, and the top coat goes on once the full build has been measured.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.