Fire protection for steel beams in Buckinghamshire

Survey, engineer's design and installation of fire protection for steel beams anywhere in Buckinghamshire.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Buckinghamshire and nearby

Free survey in Buckinghamshire

Tell us about your fire protection for steel beams project in Buckinghamshire.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning fire protection for steel beams in Buckinghamshire

Fire protection for steel beams is the layer of fire-rated board or intumescent coating applied to structural steel so it keeps its strength long enough in a fire for people to get out. Steel softens as it heats, so building regulations set a period of fire resistance for beams and columns, and the protection is chosen and applied to meet that period.

Fire protection for steel beams in Buckinghamshire follows the same careful process wherever the property is: a survey, an engineer's design, the right approval and safe temporary works. We can survey in places such as Milton Keynes, Amersham and High Wycombe and the villages around them. We price it all up front so there are no surprises once the wall is open.

Worth knowing before you start

  • Boarding is fairly clean work, but coatings need a clean, dry and well-ventilated room at a suitable temperature. Dust from other trades can spoil the surface, so painting is normally scheduled once the messy work in that room is finished.
  • A common fault is applying intumescent paint over the wrong primer, or over one of unknown type. The products must be compatible, so where steel was primed long ago the primer is identified or the surface is cleaned back before coating.
  • Fire boarding should not be cut into casually later on. Downlights, cables and pipes pushed through the boxing can weaken it, so services are planned before boarding, and any openings are sealed with suitable fire-stopping materials.
  • The fire resistance needed depends on the building and where the steel sits. In a typical two-storey house, elements of structure commonly need 30 minutes, but taller homes, flats and commercial premises can need more. The engineer and building control confirm the figure.
  • Keep a record of what was fitted: the board type and number of layers, or the coating product, thickness readings and number of coats. Building control may ask for it, and it helps answer queries when the house is sold.

Four stages, one team

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

How much should I budget in Buckinghamshire?

As a guide, budget £170–£670 per beam including VAT for fire protection to a steel beam in Buckinghamshire, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£170–£670 per beamFire-rated board boxing or an intumescent coating system as specified
Steel column or post£560–£1,680 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Plastering and making good£340–£1,340Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
RSJ supply and fit (single beam)£900–£2,800 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for Buckinghamshire

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Fire protection for steel beams in Buckinghamshire: your questions

What happens at the survey visit in Buckinghamshire?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Which towns in Buckinghamshire do you cover?

We cover towns including Milton Keynes, High Wycombe, Aylesbury and Bletchley, plus the villages and smaller towns around them.

Does a steel column need fire protection as well as the beam?

Usually, if the column is part of the load path. A column carrying a beam is just as important in a fire, so it normally needs the same fire resistance. Columns are often boxed with board or coated with intumescent paint, and the engineer's design and building control confirm what applies to yours.

Can I put downlights in a boxed-in steel beam?

Only with planning. Cutting holes in fire boarding can weaken its protection, so any lights in or near the boxing need to be designed in, using fire-rated fittings or suitable fire-stopping where the board is pierced. It is far easier to sort this out before the boxing goes up than to adapt it afterwards.

Can I box in a steel beam with normal plasterboard?

Not where fire protection is required. Standard plasterboard is not designed to protect steel for a set period in a fire. Fire-rated plasterboard is used instead, fixed in the number of layers and with the fixings the system specifies, so the boxing performs as intended and passes when building control checks it.

Does a steel beam in a house need fire protection?

Usually, yes. Where a steel beam or column holds up part of the structure, building regulations normally require it to resist fire for a set period, commonly 30 minutes in a typical house. Building control confirms what is needed for your property, and the protection is checked before the work is signed off.

Can I stay at home while the work is done in Buckinghamshire?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.