Steel BeamInstallers
Steel beam half boxed in pink fire-rated plasterboard

Fire protection for steel beams · Menai Bridge

Fire protection for steel beams in Menai Bridge

Steelwork, approvals and making good for fire protection for steel beams in Menai Bridge and nearby.

  • Free survey visit in Menai Bridge
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Menai Bridge

Tell us about the fire protection for steel beams job in Menai Bridge.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning fire protection for steel beams in Menai Bridge

We carry out fire protection for steel beams in Menai Bridge, covering the LL59 postcode district. Our coverage runs across Anglesey, so nearby villages are included too. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.

We fit fire protection alongside new steelwork, and as a standalone job where steel was installed without it or building control has asked for more. That covers boxing with fire-rated plasterboard, intumescent coatings for steel left on show, and the records building control needs to see before signing the work off.

Worth knowing before you start

  • Boarding is fairly clean work, but coatings need a clean, dry and well-ventilated room at a suitable temperature. Dust from other trades can spoil the surface, so painting is normally scheduled once the messy work in that room is finished.
  • Keep a record of what was fitted: the board type and number of layers, or the coating product, thickness readings and number of coats. Building control may ask for it, and it helps answer queries when the house is sold.
  • Boxing is generally the lower-cost route for steel that will be hidden. Intumescent coatings cost more because of the product and the number of coats, and the price rises with the fire period and the size of the section.
  • Older homes sometimes have steel fitted decades ago with no protection at all, or boxed in ordinary timber and hardboard. When this turns up during other work, we can check what is there and price protection to suit today's requirements.
  • Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.

From survey to sign-off in Menai Bridge

  1. Free visit

    A short visit to Menai Bridge to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit the application or notice to Isle of Anglesey County Council under the Building Regulations as they apply in Wales, before work starts.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

Guide prices for fire protection for steel beams in Menai Bridge

As a guide, budget £140–£550 per beam including VAT for fire protection to a steel beam in Menai Bridge, based on published UK cost guides adjusted for prices in Wales (-9%).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£140–£550 per beamFire-rated board boxing or an intumescent coating system as specified
Structural calculations for a beam£230–£680Site measure or photos, beam and padstone design and calculations for building control
RSJ supply and fit (single beam)£730–£2,280 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Plastering and making good£270–£1,090Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up

Figures include our approximate regional adjustment for prices in Wales (-9%) and are rounded. How these figures are worked out.

Building control and neighbours in Menai Bridge

Welsh building regulations treat beams and new openings as controlled building work. We apply to Isle of Anglesey County Council on your behalf before anything is removed, give the commencement notice the 2026 Welsh rules require, and the steel is checked before it is boxed in.

Where the steel bears into a wall shared with next door, notice must be served under the Party Wall etc. Act 1996. If your neighbour dissents, surveyors agree how the work is done before it starts.

Building rules in Wales

Fire protection for steel beams near Menai Bridge

Local questions answered

Can I stay at home while the work is done in Menai Bridge?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

How soon can fire protection for steel beams start in Menai Bridge?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Will building control check the fire protection on my beam?

Yes. Building control looks at fire protection as part of the structural work, normally at or before the final inspection. For boxing they may want to see the board before it is skimmed, and for coatings they may ask for the product details and thickness readings. We keep these records ready for them.

Is boxing in a steel beam cheaper than intumescent paint?

Usually, yes. Boxing with fire-rated plasterboard tends to cost less for steel that will be hidden. Intumescent coatings generally cost more because of the product and the number of coats needed, but they let the beam stay visible. Where either method would work, both can be priced on the itemised quote so you can compare.

Does a steel column need fire protection as well as the beam?

Usually, if the column is part of the load path. A column carrying a beam is just as important in a fire, so it normally needs the same fire resistance. Columns are often boxed with board or coated with intumescent paint, and the engineer's design and building control confirm what applies to yours.

What happens at the survey visit in Menai Bridge?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.