Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · Wiltshire

Chimney breast removal in Wiltshire

Calculations, approvals, propping, steel and making good for chimney breast removal across Wiltshire.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Wiltshire

Tell us about your chimney breast removal project in Wiltshire.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our chimney breast removal service in Wiltshire

Chimney breast removal is taking out the projecting brickwork that houses the flues from fireplaces, usually to gain floor space or straighten a wall. If any of the breast or stack above stays in place, it must be carried on steel or another support the engineer designs and building control accepts, so it is never left unsupported.

If you are planning chimney breast removal in Wiltshire, the order of work matters as much as the steel: survey, calculations, approval, propping, installation, inspection and making good. That includes Chippenham, Swindon and Trowbridge, plus smaller towns and villages nearby. We run that sequence for you as one job with one point of contact.

Things to plan for

  • A chimney closed off at both ends can trap moisture and cause damp patches on the walls. Where part of a flue remains, a vent at room level and a ventilated cap on the pot keep air moving through it.
  • Removing a ground-floor breast with steel support typically takes two to four working days. Full-height removal including the stack and roof repair takes longer and depends on scaffolding, roofing access and the weather.
  • Once the breast is gone, the wall behind it is often rough, sooty or uneven. It is cleaned back, dubbed out where needed and plastered flat, and the floor where the hearth sat is filled level to meet the surrounding boards or screed.
  • A flue still serving a gas fire, boiler or wood burner cannot be removed until that appliance is disconnected and an alternative arranged. Work on any gas appliance or pipe must, by law, be done by a Gas Safe registered engineer.
  • Chimney brickwork is heavy and dirty. Even a single breast produces a lot of rubble and soot, so a skip or waste collection is planned in advance, and floors, stairs and furniture along the route out are protected.

From survey to sign-off in Wiltshire

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

What does chimney breast removal cost in Wiltshire?

As a guide, budget £1,550–£3,100 including VAT for chimney breast removal (ground floor) in Wiltshire, based on published UK cost guides adjusted for prices in the South West (+3%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,550–£3,100Ground-floor breast removed, steel to support the breast above, building control and making good
Load-bearing wall removal with steel beam£2,050–£5,150Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Party wall surveyor (agreed surveyor, per neighbour)£930–£2,060 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)
Structural calculations for a beam£260–£770Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.

Building control and neighbours in Wiltshire

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Chimney breast removal by town

Local questions answered

Which towns in Wiltshire do you cover?

We cover towns including Swindon, Salisbury, Trowbridge and Chippenham, plus the villages and smaller towns around them.

Who approves chimney breast removal in Wiltshire?

Structural work in Wiltshire needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

What if my chimney breast was removed without support?

Get it checked by a structural engineer as soon as possible. If the upper breast or stack has no adequate support, it may need propping straight away. A support can usually be fitted retrospectively, and in England and Wales a regularisation application to the local authority can be used to get the unauthorised work approved.

Should I remove the chimney stack as well?

It often makes sense if the breast is coming out on every floor, because then nothing is left to support. It needs scaffolding and roof repairs, and in terraces the stack is often shared, so your side may not be removable without affecting your neighbour's. The engineer and building control confirm what is possible.

Can I remove a chimney breast downstairs and keep the fireplace upstairs?

Usually, as long as the upstairs breast and its flue stay intact and are carried on a support the engineer designs for that load. Building control must approve the arrangement. If the upstairs fireplace has a gas fire, any work on it or its supply must be carried out by a Gas Safe registered engineer.

Can I remove a chimney breast on the ground floor only?

Yes, but whatever stays above must be properly supported. The structural engineer designs that support, usually a steel beam bearing onto walls that can take the load, and building control must approve it before work starts. Leaving an upper breast or stack without adequate support is dangerous and is a problem surveyors look for.

What happens at the survey visit in Wiltshire?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.