Steel BeamInstallers
Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · Newburn

Chimney breast removal in Newburn

Steelwork, approvals and making good for chimney breast removal in Newburn and nearby.

  • Free survey visit in Newburn
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Newburn

Tell us about the chimney breast removal job in Newburn.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Chimney breast removal in Newburn: how it works

For homes in Newburn and the NE5 and NE15 districts, we handle chimney breast removal from survey to sign-off. Newburn is around 5.3 miles from Newcastle upon Tyne, and we cover both. The beam is sized by a structural engineer and inspected before it is boxed in.

Chimney breasts take up a surprising amount of room, especially in the kitchens and bedrooms of older terraces and semis. Removing one is common, but it is structural work: the breast usually continues upstairs and up through the roof, and in terraces the stack is often shared with the house next door.

Worth knowing before you start

  • In terraces and semis the chimney stack usually serves both houses, with flues from each side rising together. You can generally only alter your own side, and the work must not weaken your neighbour's breast or flues, which is why party wall procedures often apply.
  • Removing only the ground-floor breast leaves the upper breast and stack in place, so they must be supported. Taking the breast out on every floor and removing the stack above the roof avoids that load entirely, but involves roofing work and more disruption.
  • If you remove the breast in a ground-floor room but want to keep a fireplace or the breast in the bedroom above, the steel underneath must be designed for that load. Its ends need solid bearings, which may mean pockets cut into the party wall.
  • Some owners remove breasts in the loft to make space for a conversion while keeping the stack on the roof. That leaves the stack carried at loft level on steel or another support, which the engineer must design and building control must approve before work starts.
  • Removing a ground-floor breast with steel support typically takes two to four working days. Full-height removal including the stack and roof repair takes longer and depends on scaffolding, roofing access and the weather.

What happens, step by step

  1. Survey in Newburn

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to Newcastle City Council, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What does chimney breast removal cost in Newburn?

As a guide, budget £1,400–£2,800 including VAT for chimney breast removal (ground floor) in Newburn, based on published UK cost guides adjusted for prices in the North East (-7%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,400–£2,800Ground-floor breast removed, steel to support the breast above, building control and making good
Party wall surveyor (agreed surveyor, per neighbour)£840–£1,860 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)
Loft conversion steels£2,300–£5,600Supply and fit of floor and ridge steels on padstones, including lifting into the roof space
Plastering and making good£280–£1,120Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up

Figures include our approximate regional adjustment for prices in the North East (-7%) and are rounded. How these figures are worked out.

Building control and neighbours in Newburn

For Newburn, building control is provided by Newcastle City Council, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Chimney breast removal near Newburn

Questions about chimney breast removal in Newburn

Do you also work near Newburn?

Yes. We also cover nearby towns including Gosforth, Newcastle upon Tyne, Gateshead and Felling.

Do you cover Newburn for chimney breast removal?

Yes. We carry out chimney breast removal in Newburn and the NE5 and NE15 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Are gallows brackets allowed for chimney breast support?

Sometimes, but not always. Gallows brackets are used for lighter loads in certain situations, yet many building control bodies will not accept them where the remaining breast is heavy, sits on a party wall or carries the neighbour's flues. The structural engineer proposes a method and building control decides whether it is acceptable.

Should I remove the chimney stack as well?

It often makes sense if the breast is coming out on every floor, because then nothing is left to support. It needs scaffolding and roof repairs, and in terraces the stack is often shared, so your side may not be removable without affecting your neighbour's. The engineer and building control confirm what is possible.

What if my chimney breast was removed without support?

Get it checked by a structural engineer as soon as possible. If the upper breast or stack has no adequate support, it may need propping straight away. A support can usually be fitted retrospectively, and in England and Wales a regularisation application to the local authority can be used to get the unauthorised work approved.

Do I need a party wall agreement for chimney breast removal in Newburn?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.