Chimney breast removal · Egham
Chimney breast removal in Egham
Chimney breast removal in Egham, from free survey to completion certificate.
- Itemised written quote
- Beam sized by a structural engineer
- Covering Egham and nearby
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Planning chimney breast removal in Egham
If you live in Egham, chimney breast removal can usually be planned and priced after a single survey visit. It sits about 5.7 miles from Slough, which we also cover. We cover GU25, TW18, TW19 and TW20, and we fix the price in writing once the layout and scope are agreed.
We cover the survey visit, structural calculations from a qualified engineer, building control, party wall notices through a party wall surveyor where needed, temporary support, removal, the steelwork and making good. Whether you are taking out the ground-floor breast only or the full height, the itemised written quote shows each stage.
Things to plan for
- A chimney closed off at both ends can trap moisture and cause damp patches on the walls. Where part of a flue remains, a vent at room level and a ventilated cap on the pot keep air moving through it.
- Gallows brackets are steel angle brackets fixed into the wall to hold a breast above. They are often not accepted where the remaining masonry is heavy or sits against the neighbour's breast, so the engineer and building control decide which support method is suitable.
- Once the breast is gone, the wall behind it is often rough, sooty or uneven. It is cleaned back, dubbed out where needed and plastered flat, and the floor where the hearth sat is filled level to meet the surrounding boards or screed.
- A flue still serving a gas fire, boiler or wood burner cannot be removed until that appliance is disconnected and an alternative arranged. Work on any gas appliance or pipe must, by law, be done by a Gas Safe registered engineer.
- Removing a ground-floor breast with steel support typically takes two to four working days. Full-height removal including the stack and roof repair takes longer and depends on scaffolding, roofing access and the weather.
What happens, step by step
Survey in Egham
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
How much should I budget in Egham?
As a guide, budget £1,700–£3,350 including VAT for chimney breast removal (ground floor) in Egham, based on published UK cost guides adjusted for prices in the South East (+12%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Chimney breast removal (ground floor) | £1,700–£3,350 | Ground-floor breast removed, steel to support the breast above, building control and making good |
| Through-lounge knock-through | £2,800–£6,150 | Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill |
| Structural calculations for a beam | £280–£840 | Site measure or photos, beam and padstone design and calculations for building control |
| Plastering and making good | £340–£1,340 | Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up |
Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.
Building control and neighbours in Egham
Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Questions about chimney breast removal in Egham
Do you also work near Egham?
Yes. We also cover nearby towns including Staines, Ashford, Windsor and Slough.
Can you work on older or listed homes in Egham?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
What if my chimney breast was removed without support?
Get it checked by a structural engineer as soon as possible. If the upper breast or stack has no adequate support, it may need propping straight away. A support can usually be fitted retrospectively, and in England and Wales a regularisation application to the local authority can be used to get the unauthorised work approved.
Can I remove a chimney breast downstairs and keep the fireplace upstairs?
Usually, as long as the upstairs breast and its flue stay intact and are carried on a support the engineer designs for that load. Building control must approve the arrangement. If the upstairs fireplace has a gas fire, any work on it or its supply must be carried out by a Gas Safe registered engineer.
How long does chimney breast removal take?
A ground-floor breast with a steel beam supporting the masonry above usually takes two to four working days, including propping, fitting the steel, removing the brickwork and basic making good. Full removal from ground floor to roof takes longer because of scaffolding, roofing work and weather, and plaster needs time to dry afterwards.