Steel BeamInstallers
Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · Ely

Chimney breast removal in Ely

Chimney breast removal for homes in CB6, designed by a structural engineer.

  • Survey, design and installation in one
  • Covering CB6
  • Inspected before it is covered

Free survey in Ely

Tell us about the chimney breast removal job in Ely.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our chimney breast removal service in Ely

For homes in Ely and the CB6 district, we handle chimney breast removal from survey to sign-off. We also cover the surrounding towns and villages in Cambridgeshire. The beam is sized by a structural engineer and inspected before it is boxed in.

We cover the survey visit, structural calculations from a qualified engineer, building control, party wall notices through a party wall surveyor where needed, temporary support, removal, the steelwork and making good. Whether you are taking out the ground-floor breast only or the full height, the itemised written quote shows each stage.

What to expect

  • If you remove the breast in a ground-floor room but want to keep a fireplace or the breast in the bedroom above, the steel underneath must be designed for that load. Its ends need solid bearings, which may mean pockets cut into the party wall.
  • A chimney breast removed without proper support or approval is a frequent issue raised in surveys when a house is sold. Keeping the calculations, completion certificate and any party wall documents shows a buyer that what remains was properly supported.
  • Chimney brickwork is heavy and dirty. Even a single breast produces a lot of rubble and soot, so a skip or waste collection is planned in advance, and floors, stairs and furniture along the route out are protected.
  • In terraces and semis the chimney stack usually serves both houses, with flues from each side rising together. You can generally only alter your own side, and the work must not weaken your neighbour's breast or flues, which is why party wall procedures often apply.
  • Some owners remove breasts in the loft to make space for a conversion while keeping the stack on the roof. That leaves the stack carried at loft level on steel or another support, which the engineer must design and building control must approve before work starts.

Four stages, one team

  1. Free visit

    A short visit to Ely to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

Guide prices for chimney breast removal in Ely

As a guide, budget £1,600–£3,200 including VAT for chimney breast removal (ground floor) in Ely, based on published UK cost guides adjusted for prices in the East of England (+6%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,600–£3,200Ground-floor breast removed, steel to support the breast above, building control and making good
Through-lounge knock-through£2,650–£5,850Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill
Plastering and making good£320–£1,270Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Structural calculations for a beam£260–£800Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the East of England (+6%) and are rounded. How these figures are worked out.

Building rules for Ely

For Ely, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Chimney breast removal near Ely

Questions about chimney breast removal in Ely

Do I need a party wall agreement for chimney breast removal in Ely?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

What happens at the survey visit in Ely?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Can I remove a chimney breast on the ground floor only?

Yes, but whatever stays above must be properly supported. The structural engineer designs that support, usually a steel beam bearing onto walls that can take the load, and building control must approve it before work starts. Leaving an upper breast or stack without adequate support is dangerous and is a problem surveyors look for.

Do I need building regulations to remove a chimney breast?

Yes. Removing all or part of a chimney breast is structural work. In England it needs building regulations approval through a full plans application or building notice, and in Wales an application under the Welsh regulations; in Scotland a building warrant is needed before starting; in Northern Ireland an application goes to council building control. We prepare and submit this with the engineer's calculations.

Are gallows brackets allowed for chimney breast support?

Sometimes, but not always. Gallows brackets are used for lighter loads in certain situations, yet many building control bodies will not accept them where the remaining breast is heavy, sits on a party wall or carries the neighbour's flues. The structural engineer proposes a method and building control decides whether it is acceptable.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.