Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · Cambridgeshire

Chimney breast removal in Cambridgeshire

Survey, engineer's design and installation of chimney breast removal anywhere in Cambridgeshire.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Cambridgeshire and nearby

Free survey in Cambridgeshire

Tell us about your chimney breast removal project in Cambridgeshire.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Chimney breast removal in Cambridgeshire: how it works

Chimney breast removal is taking out the projecting brickwork that houses the flues from fireplaces, usually to gain floor space or straighten a wall. If any of the breast or stack above stays in place, it must be carried on steel or another support the engineer designs and building control accepts, so it is never left unsupported.

Looking for chimney breast removal in Cambridgeshire? We can survey in places such as March, St Neots and Cambridge and the villages around them. Our teams handle the calculations, the building control approval, the propping and the steel itself, and leave the opening ready for plastering and decoration.

Worth knowing before you start

  • Gallows brackets are steel angle brackets fixed into the wall to hold a breast above. They are often not accepted where the remaining masonry is heavy or sits against the neighbour's breast, so the engineer and building control decide which support method is suitable.
  • The price depends on how many floors the breast spans, whether the stack is kept or removed, the support method the engineer specifies, roof and scaffold work, and how much rubble needs taking away. Each is listed separately in the quote.
  • Removing a ground-floor breast with steel support typically takes two to four working days. Full-height removal including the stack and roof repair takes longer and depends on scaffolding, roofing access and the weather.
  • Once the breast is gone, the wall behind it is often rough, sooty or uneven. It is cleaned back, dubbed out where needed and plastered flat, and the floor where the hearth sat is filled level to meet the surrounding boards or screed.
  • A flue still serving a gas fire, boiler or wood burner cannot be removed until that appliance is disconnected and an alternative arranged. Work on any gas appliance or pipe must, by law, be done by a Gas Safe registered engineer.

How the job runs in Cambridgeshire

  1. Free visit

    A short visit to Cambridgeshire to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

How much should I budget in Cambridgeshire?

As a guide, budget £1,600–£3,200 including VAT for chimney breast removal (ground floor) in Cambridgeshire, based on published UK cost guides adjusted for prices in the East of England (+6%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,600–£3,200Ground-floor breast removed, steel to support the breast above, building control and making good
Through-lounge knock-through£2,650–£5,850Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill
Loft conversion steels£2,650–£6,350Supply and fit of floor and ridge steels on padstones, including lifting into the roof space
Load-bearing wall removal with steel beam£2,100–£5,300Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good

Figures include our approximate regional adjustment for prices in the East of England (+6%) and are rounded. How these figures are worked out.

Building rules for Cambridgeshire

For Cambridgeshire, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Chimney breast removal in Cambridgeshire: your questions

How much does chimney breast removal cost in Cambridgeshire?

As a guide, budget £1,600–£3,200 including VAT for chimney breast removal (ground floor) in Cambridgeshire, based on published UK cost guides adjusted for prices in the East of England (+6%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

What happens at the survey visit in Cambridgeshire?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Do I need my neighbour's permission to remove a chimney breast?

Not permission as such, but in England and Wales you must serve notice under the Party Wall etc. Act 1996 if the breast is attached to a party wall, and your neighbour can consent or dissent. You cannot remove their half of a shared stack. Scotland and Northern Ireland have no equivalent Act, so the title deeds and general law apply.

Should I remove the chimney stack as well?

It often makes sense if the breast is coming out on every floor, because then nothing is left to support. It needs scaffolding and roof repairs, and in terraces the stack is often shared, so your side may not be removable without affecting your neighbour's. The engineer and building control confirm what is possible.

Do I need building regulations to remove a chimney breast?

Yes. Removing all or part of a chimney breast is structural work. In England it needs building regulations approval through a full plans application or building notice, and in Wales an application under the Welsh regulations; in Scotland a building warrant is needed before starting; in Northern Ireland an application goes to council building control. We prepare and submit this with the engineer's calculations.

How long does chimney breast removal take?

A ground-floor breast with a steel beam supporting the masonry above usually takes two to four working days, including propping, fitting the steel, removing the brickwork and basic making good. Full removal from ground floor to roof takes longer because of scaffolding, roofing work and weather, and plaster needs time to dry afterwards.

Can I stay at home while the work is done in Cambridgeshire?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.