Steel BeamInstallers
Basement conversion with steel beams and a steel column on a concrete floor

Basement & cellar steels · Fleet

Basement & cellar steels in Fleet

Steelwork, approvals and making good for basement & cellar steels in Fleet and nearby.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Fleet

Tell us about the basement & cellar steel job in Fleet.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning basement & cellar steels in Fleet

For homes in Fleet and the GU13, GU14, GU51 and GU52 districts, we handle basement & cellar steels from survey to sign-off. Fleet is around 11.1 miles from Basingstoke, and we cover both. The beam is sized by a structural engineer and inspected before it is boxed in.

Turning a cellar into a habitable room, or digging a new basement, nearly always means moving or removing walls that hold up the rest of the house. Steel beams and columns take over that support, often while the existing walls are being deepened by underpinning and the space is protected against water.

Worth knowing before you start

  • Underpinning deepens the existing foundations so walls can go lower, and a specialist carries it out in a strict bay-by-bay sequence. Steelwork has to fit around that sequence, which is why the engineer plans the two together from the start.
  • Below-ground rooms need a waterproofing design, often a cavity drain membrane, a tanking system or both. Column bases and beam bearings that pass through the waterproofing are detailed so they do not become a route for water.
  • Basement steel frames often rely on columns because there is nowhere else to land the load. Each column sits on its own foundation or a thickened part of the slab, and its position needs agreeing early so it does not end up in the middle of a room.
  • Getting steel into a basement means lowering it through a lightwell, a stair opening or a temporary hole in the ground floor. Long beams may be designed in bolted sections so they can be handled in tight below-ground spaces.
  • Cellars often house gas meters, the incoming water main, the electricity supply and old drainage. These are mapped before work starts, gas work must by law be done by a Gas Safe registered engineer, and the electricity network operator may need to move a supply.

Four stages, one team

  1. Survey in Fleet

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

How much should I budget in Fleet?

As a guide, budget £2,800–£7,300 including VAT for basement or cellar steelwork in Fleet, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Basement or cellar steelwork£2,800–£7,300Beams and columns with pad foundations under the floor above (excavation and waterproofing extra)
Fire protection to a steel beam£170–£670 per beamFire-rated board boxing or an intumescent coating system as specified
Party wall surveyor (agreed surveyor, per neighbour)£1,000–£2,250 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)
Building control fees£280–£730Building notice or full plans fee and inspections; varies by council or approver

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for Fleet

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Basement & cellar steels near Fleet

Questions about basement & cellar steels in Fleet

What happens at the survey visit in Fleet?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Do I need a party wall agreement for basement & cellar steels in Fleet?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

How is steel protected from damp in a basement?

Steel below ground is protected against corrosion as the engineer specifies, which may mean a heavier-duty paint system or galvanising. It is also kept on the dry side of the waterproofing where possible, and fixings through the waterproofing are detailed so they do not let water in.

What paperwork will I get for basement steelwork?

You should end up with the engineer's calculations and drawings, the building control completion certificate, the waterproofing details and, where it applied, the party wall paperwork. Keep them together, as surveyors and solicitors usually ask for them when the property is sold or remortgaged.

Do I need steel beams for a cellar conversion?

Often, yes. If any cellar walls are being removed or opened up, or the ground floor above is being altered for a stair or lightwell, steel beams and columns are usually needed to carry the house above. A structural engineer looks at the layout and loads and specifies the steelwork.

Do you also work near Fleet?

Yes. We also cover nearby towns including Farnborough, Aldershot, Yateley and Sandhurst.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.