Steel BeamInstallers
Ground-floor chimney breast removed with a short steel beam carrying the breast above

East Sussex · England

Steel beam installers in Hove

RSJs and steel beams for homes and businesses in Hove, with calculations, approvals, propping and making good.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Hove

Tell us about your project in Hove.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Steel beam work in Hove

If you are in Hove or the BN1, BN2, BN3 and BN41 districts, we can survey, design and install the steel for your opening. We also work in nearby Brighton, roughly 1.2 miles away. One team handles the approvals, the propping, the beam and the finish.

Approval in Hove is through council building control or a registered building control approver, and party wall notices apply where steel bears into a shared wall.

How the job runs in Hove

  1. Survey in Hove

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to Brighton & Hove City Council, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

Guide prices in Hove

As a guide, budget £2,250–£5,600 including VAT for load-bearing wall removal with steel beam in Hove, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Load-bearing wall removal with steel beam£2,250–£5,600Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Chimney breast removal (ground floor)£1,700–£3,350Ground-floor breast removed, steel to support the breast above, building control and making good
Rear wall opening for bi-fold or sliding doors£2,800–£7,850External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Loft conversion steels£2,800–£6,700Supply and fit of floor and ridge steels on padstones, including lifting into the roof space
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules in Hove

Structural openings in English homes need building regulations approval before work starts. Brighton & Hove City Council can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Near Hove

Steel beams in Hove: questions

Do you also work near Hove?

Yes. We also cover nearby towns including Brighton, Portslade, Rottingdean and Burgess Hill.

How soon can steel beam installation start in Hove?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Can you work on older or listed homes in Hove?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

What happens at the survey visit in Hove?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Do you cover Hove for steel beam installation?

Yes. We carry out steel beam installation in Hove and the BN1, BN2, BN3 and BN41 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

More in East Sussex

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.