Garage conversion openings in Hove

Garage conversion openings for homes in BN1, BN2, BN3, designed by a structural engineer.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Hove

Tell us about the garage conversion opening job in Hove.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our garage conversion openings service in Hove

If you live in Hove, garage conversion openings can usually be planned and priced after a single survey visit. Hove is around 1.2 miles from Brighton, and we cover both. We cover BN1, BN2, BN3 and BN41, and we fix the price in writing once the layout and scope are agreed.

For integral garages with a bedroom above, the beam over the garage door matters even more, because it carries the front wall of the room upstairs. We arrange the survey visit, engineer's calculations, building control, propping, any steel and making good, with the structural items set out in one itemised written quote.

Things to plan for

  • Garages often hold gas meters, consumer units, boilers or water stopcocks. These are located at survey, and anything that needs moving is done by the right trade, including a Gas Safe registered engineer for any work on gas pipework.
  • With an integral garage, the room above usually has its front wall sitting on the beam over the garage door. Any sag or rust in that beam matters more because it carries a wall and floor, and replacing it means propping the upstairs while new steel goes in.
  • Garage floors often sit lower than the house floor and may have no damp-proof membrane. The infill wall needs a damp-proof course linked to the existing walls, and the floor usually needs a membrane, insulation and screed raised to the house level.
  • The structural part of a garage conversion, covering the infill foundation, the wall and any new opening, typically takes one to two weeks. The full conversion with insulation, electrics, plastering and flooring takes longer, depending on the scope.
  • Most garage conversions do not need planning permission, but some estates have conditions removing permitted development rights for garages, and listed buildings or flats need consent. Changing the front elevation can also need permission in some areas.

Four stages, one team

  1. Survey in Hove

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to Brighton & Hove City Council, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

How much should I budget in Hove?

As a guide, budget £1,100–£3,350 including VAT for garage door opening infill (structural part) in Hove, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Garage door opening infill (structural part)£1,100–£3,350Beam or lintel checked or replaced, foundation and infill wall for the old door opening (window and finishes extra)
RSJ supply and fit (single beam)£900–£2,800 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Widening an internal doorway£1,100–£2,800Opening widened with a new lintel or short beam, approval where structural, and making good
Building control fees£280–£730Building notice or full plans fee and inspections; varies by council or approver

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Approvals in Hove

For Hove, building control is provided by Brighton & Hove City Council, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Garage conversion openings near Hove

Local questions answered

Can you work on older or listed homes in Hove?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

What happens at the survey visit in Hove?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Does the infill wall need foundations?

Yes. A new masonry wall across the garage door opening needs a proper footing, as the existing garage slab is usually not designed to carry it. A trench is dug across the opening and a foundation is formed to the engineer's and building control's requirements, then inspected before the wall is built.

What happens to the beam over my garage door?

It is checked by the engineer. Many can stay, carrying the wall above as before, with the infill built underneath. If it is timber that has rotted, a corroded steel section or simply undersized for the loads, it is replaced, with the wall or room above propped while the new steel goes in.

How long do the structural works for a garage conversion take?

Typically one to two weeks for the structural stage: digging and concreting the infill foundation, building the infill wall, and forming any new opening into the house. Building control inspections fit around these stages, and the insulation, electrics, plastering and flooring of the conversion follow on afterwards.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.