Wider doorways & openings · Streatham
Wider doorways & openings in Streatham
Wider doorways & openings in Streatham, from free survey to completion certificate.
- Itemised written quote
- Beam sized by a structural engineer
- Covering Streatham and nearby
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Planning wider doorways & openings in Streatham
Wider doorways & openings in Streatham are planned around the house, not a standard kit. We also cover the surrounding towns and villages in London. We visit, measure and check what the wall carries, then arrange calculations and building control approval before any steel is ordered.
We arrange a survey visit, structural calculations where the wall is load-bearing, building control, propping, the lintel or beam, new door linings if you want them, and making good. One itemised written quote covers the lot, and the price is fixed in writing once the opening size and finish are agreed.
What to expect
- Openings are cut with a masonry saw where possible rather than broken out with a hammer. Clean cuts keep the brickwork either side sound, give a straighter edge for plastering and send less vibration through the rest of the wall.
- When an opening widens, the old threshold strip and floor finishes often stop short. Carpet, boards or tiles need joining neatly across the new width, and a change in floor height between rooms may need a threshold bar or a gentle ramp.
- Widening doorways is a frequent adaptation for wheelchair users and people using walking frames. Where a council grant or adaptation scheme is helping to pay, check its requirements for clear opening width before the opening is designed.
- For a modest increase in width, a lintel may be all that is needed, while a wider opening carrying a floor or wall usually needs steel. The engineer chooses the type and size from the actual loads, never from the opening width alone.
- Older door surrounds and walls can hide asbestos in textured coatings, insulating board above doors or panelling. In buildings built before 2000 it must be identified before the wall is cut, so a refurbishment survey of the area is arranged where there is a risk.
From survey to sign-off in Streatham
Survey in Streatham
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
How much should I budget in Streatham?
As a guide, budget £1,300–£3,200 including VAT for widening an internal doorway in Streatham, based on published UK cost guides adjusted for London prices (+28%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Widening an internal doorway | £1,300–£3,200 | Opening widened with a new lintel or short beam, approval where structural, and making good |
| RSJ supply and fit (single beam) | £1,000–£3,200 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
| Building control fees | £320–£830 | Building notice or full plans fee and inspections; varies by council or approver |
| Plastering and making good | £380–£1,540 | Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up |
Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.
Building control and neighbours in Streatham
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Questions about wider doorways & openings in Streatham
Can you work on older or listed homes in Streatham?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
Can I stay at home while the work is done in Streatham?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
What is included in the price for a wider doorway?
The itemised written quote lists the survey, any engineer's calculations and building control fees, propping, cutting the opening, the lintel or steel, linings or plastered reveals, and making good. Moving services, supplying doors and flooring joins appear as separate lines. The price is fixed in writing once the size and finish are agreed.
Is a lintel or a steel beam needed for a wider door?
It depends on the loads. A lintel can be enough for a modest widening under light loads, while an opening carrying floor joists or a wall above usually needs steel. The engineer decides from the actual loads and span rather than the width alone, and we fit whichever is specified.
How long does it take to widen a doorway?
The structural part usually takes one to two working days: propping, cutting the opening, fitting the lintel or beam and packing it. Plastering follows, then a few days of drying before linings are painted or a new door is hung. Building control inspection fits in once the support is in place.