Steel BeamInstallers
Victorian through-lounge with a boxed beam where the dividing wall used to be

Through-lounge knock-throughs · Bedworth

Through-lounge knock-throughs in Bedworth

Through-lounge knock-throughs in Bedworth, from free survey to completion certificate.

  • Survey, design and installation in one
  • Covering CV11, CV12
  • Inspected before it is covered

Free survey in Bedworth

Tell us about the through-lounge knock-through job in Bedworth.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What through-lounge knock-throughs involve in Bedworth

For homes in Bedworth and the CV11 and CV12 districts, we handle through-lounge knock-throughs from survey to sign-off. It sits about 5.3 miles from Coventry, which we also cover. The beam is sized by a structural engineer and inspected before it is boxed in.

Many period terraces and semis were built with a front parlour and a back sitting room divided by a solid brick wall. Opening them into one through-lounge brings light from both ends of the house, but that wall commonly carries the floor joists, the wall between the bedrooms above and sometimes part of the roof load too.

Things to plan for

  • The structural stage for a through-lounge typically takes three to five working days. Both reception rooms are out of use for that time, so furniture is moved out or stacked and sheeted, and the hallway is kept clear as the main walkway.
  • Radiators, pipe runs and sockets on the dividing wall need relocating. Older houses sometimes have heating pipes running under the floor along the wall line, so these are traced and moved by a heating engineer before the wall comes down.
  • Cutting a pocket into a party wall for a beam end is notifiable work under the Party Wall etc. Act 1996 in England and Wales. Your neighbour can agree or dissent, and a dissent means party wall surveyors must set out how the work is done before it starts.
  • With the wall gone, the floorboards on each side may run in different directions or sit at slightly different heights. Matching reclaimed boards can be fitted across the old wall line, or the floor can be levelled for a new continuous finish.
  • Victorian brickwork is usually laid in soft lime mortar and the internal walls may be only one brick thick. The engineer allows for this when designing the bearings, and padstones are often used to spread the beam's load over the weaker masonry.

How the job runs in Bedworth

  1. Survey in Bedworth

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

How much should I budget in Bedworth?

As a guide, budget £2,500–£5,500 including VAT for through-lounge knock-through in Bedworth, based on published UK cost guides adjusted for prices in the West Midlands (no adjustment).

JobTypical guide rangeWhat it usually covers
Through-lounge knock-through£2,500–£5,500Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill
Plastering and making good£300–£1,200Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Chimney breast removal (ground floor)£1,500–£3,000Ground-floor breast removed, steel to support the breast above, building control and making good
Temporary works and propping£150–£500Props, spreaders, needles and sole plates for a typical opening, installed and struck

Figures include our approximate regional adjustment for prices in the West Midlands (no adjustment) and are rounded. How these figures are worked out.

Building rules for Bedworth

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Through-lounge knock-throughs near Bedworth

Local questions answered

Can you work on older or listed homes in Bedworth?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

What happens at the survey visit in Bedworth?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Will the ceiling crack when the wall is removed?

Some minor cracking in old lath and plaster ceilings is possible, even with careful propping, because the structure is being disturbed. We prop to spread the load and protect ceilings where we can, and any cracks are filled or repaired as part of making good. Sound plaster normally stays intact.

Can I keep the cornicing when the wall comes down?

Usually yes. The existing cornice in each room is protected during the work, and a matching profile can be run or cast to bridge the opening once the beam is boxed and plastered. How closely it matches depends on the original design and its condition, which we check at the survey visit.

How long does a through-lounge knock-through take?

The structural part usually takes three to five working days, covering needling, propping, removing the wall, fitting the steel and packing it. Party wall notice periods, plastering, period repairs and drying time sit around that, so the overall timeline depends mostly on notices and the finishing work.

Do you cover Bedworth for through-lounge knock-throughs?

Yes. We carry out through-lounge knock-throughs in Bedworth and the CV11 and CV12 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.