
Through-lounge knock-throughs · Reigate
Through-lounge knock-throughs in Reigate
Through-lounge knock-throughs for homes in RH1, RH2, designed by a structural engineer.
- Itemised written quote
- Beam sized by a structural engineer
- Covering Reigate and nearby
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Planning through-lounge knock-throughs in Reigate
We cover through-lounge knock-throughs in Reigate (RH1, RH2) and the streets around it. It sits about 8.6 miles from Crawley, which we also cover. Each job is designed by a structural engineer and approved through local building control before work begins.
Many period terraces and semis were built with a front parlour and a back sitting room divided by a solid brick wall. Opening them into one through-lounge brings light from both ends of the house, but that wall commonly carries the floor joists, the wall between the bedrooms above and sometimes part of the roof load too.
Key points for your project
- Ornate cornicing often runs around both rooms and stops at the wall being removed. Where practical, the run is extended across the opening by matching the profile, either run in place or cast, so the joined room looks original rather than patched.
- Minor hairline cracks can appear in plaster upstairs as the structure takes up the new support. This is common after a knock-through and is usually filled at decoration stage, but wider or growing cracks should be reported so they can be checked.
- The structural stage for a through-lounge typically takes three to five working days. Both reception rooms are out of use for that time, so furniture is moved out or stacked and sheeted, and the hallway is kept clear as the main walkway.
- Period ceilings are often lath and plaster, which can crack or sag when the wall below is disturbed. Props are set to spread load gently, and damaged areas are repaired with lime plaster or overboarded, depending on the condition and your preference.
- With the wall gone, the floorboards on each side may run in different directions or sit at slightly different heights. Matching reclaimed boards can be fitted across the old wall line, or the floor can be levelled for a new continuous finish.
From survey to sign-off in Reigate
Free visit
A short visit to Reigate to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for through-lounge knock-throughs in Reigate
As a guide, budget £2,800–£6,150 including VAT for through-lounge knock-through in Reigate, based on published UK cost guides adjusted for prices in the South East (+12%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Through-lounge knock-through | £2,800–£6,150 | Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill |
| Temporary works and propping | £170–£560 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
| Kitchen-diner knock-through | £2,800–£6,700 | Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra) |
| Load-bearing wall removal with steel beam | £2,250–£5,600 | Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good |
Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.
Approvals in Reigate
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Questions about through-lounge knock-throughs in Reigate
How much do through-lounge knock-throughs cost in Reigate?
As a guide, budget £2,800–£6,150 including VAT for through-lounge knock-through in Reigate, based on published UK cost guides adjusted for prices in the South East (+12%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.
Do you also work near Reigate?
Yes. We also cover nearby towns including Redhill, Horley, Banstead and Caterham.
How long does a through-lounge knock-through take?
The structural part usually takes three to five working days, covering needling, propping, removing the wall, fitting the steel and packing it. Party wall notice periods, plastering, period repairs and drying time sit around that, so the overall timeline depends mostly on notices and the finishing work.
Can I keep the cornicing when the wall comes down?
Usually yes. The existing cornice in each room is protected during the work, and a matching profile can be run or cast to bridge the opening once the beam is boxed and plastered. How closely it matches depends on the original design and its condition, which we check at the survey visit.
Is the wall between two reception rooms load-bearing?
In most period terraces and semis it is, because it carries the floor joists and the wall between the bedrooms above. Some later houses have lighter partitions in this position, so the only way to be sure is an engineer's inspection. We arrange this during the survey and design stage.
What happens at the survey visit in Reigate?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.