
Through-lounge knock-throughs · Tenby
Through-lounge knock-throughs in Tenby
Through-lounge knock-throughs for homes in SA69, SA70, designed by a structural engineer.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
What through-lounge knock-throughs involve in Tenby
Planning through-lounge knock-throughs in Tenby? Our team covers SA69 and SA70 and the streets around them. Our coverage runs across Pembrokeshire, so nearby villages are included too. You get one written quote for the calculations, approvals, propping, steel and making good.
We plan the steel so the opening suits the room's proportions and keeps period features where you want them, from chimney breasts to cornicing. The survey visit, calculations from a qualified structural engineer, building control, party wall notices through a party wall surveyor where needed, propping, steel and making good are all set out in one itemised written quote.
What to expect
- The width of the opening, whether the beam bears into a party wall, and how much period detail has to be restored all affect the price. Lath and plaster repairs, cornice matching and floorboard work are priced as separate lines in the quote.
- Chimney breasts on the party wall in each room often sit close to the dividing wall. The beam may need to bear near them or avoid them, so the engineer checks how the breasts and flues relate to the new bearing before the opening width is fixed.
- In most terraced houses the wall between the front and back rooms runs across the house and carries the floor above, plus the wall between the front and back bedrooms. It is normally load-bearing, but the engineer still checks before any design is drawn up.
- Period ceilings are often lath and plaster, which can crack or sag when the wall below is disturbed. Props are set to spread load gently, and damaged areas are repaired with lime plaster or overboarded, depending on the condition and your preference.
- Radiators, pipe runs and sockets on the dividing wall need relocating. Older houses sometimes have heating pipes running under the floor along the wall line, so these are traced and moved by a heating engineer before the wall comes down.
Four stages, one team
Free visit
A short visit to Tenby to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit the application or notice to Pembrokeshire County Council under the Building Regulations as they apply in Wales, before work starts.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for through-lounge knock-throughs in Tenby
As a guide, budget £2,300–£5,000 including VAT for through-lounge knock-through in Tenby, based on published UK cost guides adjusted for prices in Wales (-9%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Through-lounge knock-through | £2,300–£5,000 | Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill |
| Kitchen-diner knock-through | £2,300–£5,450 | Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra) |
| Party wall surveyor (agreed surveyor, per neighbour) | £820–£1,820 per neighbour | Schedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only) |
| Chimney breast removal (ground floor) | £1,350–£2,750 | Ground-floor breast removed, steel to support the breast above, building control and making good |
Figures include our approximate regional adjustment for prices in Wales (-9%) and are rounded. How these figures are worked out.
Building rules for Tenby
Removing a load-bearing wall in Wales needs approval under the Welsh building regulations before work starts. For Tenby the application goes to Pembrokeshire County Council or a registered building control approver, with the engineer's calculations, and a completion certificate follows the final inspection.
The Party Wall etc. Act 1996 applies in Wales as well as England, so a beam bearing into a shared wall needs a party structure notice at least two months before work starts. We arrange notices through a party wall surveyor.
Through-lounge knock-throughs near Tenby
- Pembroke 9.1 mi
- Pembroke Dock 10.5 mi
- Haverfordwest 14.5 mi
- Milford Haven 14.8 mi
- Burry Port 19.6 mi
- Carmarthen 21.2 mi
Questions about through-lounge knock-throughs in Tenby
Do I need a party wall agreement for through-lounge knock-throughs in Tenby?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.
Can I stay at home while the work is done in Tenby?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
Can I keep the cornicing when the wall comes down?
Usually yes. The existing cornice in each room is protected during the work, and a matching profile can be run or cast to bridge the opening once the beam is boxed and plastered. How closely it matches depends on the original design and its condition, which we check at the survey visit.
Do I need consent to knock through in a listed building?
Yes, you need both listed building consent and building regulations approval. Listed building consent from the local planning authority covers internal structural changes to the building's fabric, and building control covers the structural safety. Carrying out works to a listed building without consent is an offence, so it must be in place before anything is booked.
How long does a through-lounge knock-through take?
The structural part usually takes three to five working days, covering needling, propping, removing the wall, fitting the steel and packing it. Party wall notice periods, plastering, period repairs and drying time sit around that, so the overall timeline depends mostly on notices and the finishing work.
How much do through-lounge knock-throughs cost in Tenby?
As a guide, budget £2,300–£5,000 including VAT for through-lounge knock-through in Tenby, based on published UK cost guides adjusted for prices in Wales (-9%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.