
Temporary works & propping · Worthing
Temporary works & propping in Worthing
Temporary works & propping in Worthing, from free survey to completion certificate.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
About our temporary works & propping service in Worthing
Planning temporary works & propping in Worthing? Our team covers BN11, BN12, BN13, BN14 and BN15 and the streets around them. Worthing is around 10.3 miles from Brighton, and we cover both. You get one written quote for the calculations, approvals, propping, steel and making good.
The moment a load-bearing wall is cut, whatever it was holding needs another route to the ground. Temporary works provide that route. Done well, nothing above moves, ceilings stay intact and the floor below is not overloaded. Done badly, it is where structural work goes wrong.
Worth knowing before you start
- Typical mistakes include props standing on unsupported floorboards, missing spreaders so one joist takes all the load, and props wound up too hard so the ceiling lifts and cracks. Careful setting out and gradual tightening avoid all three.
- Props and needles cannot go where pipes, cables or flues run. Their positions are checked against services before any holes are cut, and anything in the way is isolated or rerouted first by the appropriate trade.
- Every prop delivers a concentrated load that has to go somewhere. Before any are set up, the floor beneath is checked, because a suspended timber floor or a thin slab may not take that load without extra support carried down to the ground.
- Adjustable steel props are the workhorse, with timber spreaders on top to share the load across several joists. Steel needles pass through the wall to carry masonry above an opening, and prop head attachments known as masonry support heads support brickwork without needles.
- Propping normally goes in on the first morning and stays until the beam is carrying. For a typical opening that is a few days, and longer where padstone mortar needs time to cure before the load is transferred onto it.
What happens, step by step
Free visit
A short visit to Worthing to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
What do temporary works & propping cost in Worthing?
As a guide, budget £170–£560 including VAT for temporary works and propping in Worthing, based on published UK cost guides adjusted for prices in the South East (+12%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Temporary works and propping | £170–£560 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
| Lintel replacement | £450–£1,340 per lintel | Propping, removing the old lintel, new lintel set on beds and brickwork made good |
| Structural calculations for a beam | £280–£840 | Site measure or photos, beam and padstone design and calculations for building control |
| Party wall surveyor (agreed surveyor, per neighbour) | £1,000–£2,250 per neighbour | Schedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only) |
Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.
Approvals in Worthing
Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Temporary works & propping near Worthing
- Portslade 7.2 mi
- Littlehampton 7.2 mi
- Hove 9.1 mi
- Brighton 10.3 mi
- Bognor Regis 13.5 mi
- Rottingdean 13.8 mi
Temporary works & propping in Worthing: your questions
Who approves temporary works & propping in Worthing?
Structural work in Worthing needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.
Do you also work near Worthing?
Yes. We also cover nearby towns including Portslade, Littlehampton, Hove and Brighton.
What if props need to go on my neighbour's side of the wall?
Then their agreement is needed first. Where needles pass through a party wall, props may have to stand on the neighbour's side, and in England and Wales that work is normally covered by party wall notices served before work starts. We arrange notices through a party wall surveyor where they are required.
Can I stay in my house while it is propped?
Usually, yes. The props take up space in the rooms either side of the work, so those rooms will be out of use, but the rest of the house can be lived in as normal. The props must never be moved, knocked or adjusted by anyone other than the installation team.
What is needling a wall?
Needling means cutting holes through a wall just above where an opening will go and passing short steel beams, called needles, through them. Each needle is supported on props on both sides, so the masonry above rests on the needles while the wall below is removed and the permanent beam is fitted.