Temporary works & propping in Egham

Steelwork, approvals and making good for temporary works & propping in Egham and nearby.

  • Survey, design and installation in one
  • Covering GU25, TW18, TW19
  • Inspected before it is covered

Free survey in Egham

Tell us about the temporary works & propping job in Egham.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning temporary works & propping in Egham

Planning temporary works & propping in Egham? Our team covers GU25, TW18, TW19 and TW20 and the streets around them. It sits about 5.7 miles from Slough, which we also cover. You get one written quote for the calculations, approvals, propping, steel and making good.

The moment a load-bearing wall is cut, whatever it was holding needs another route to the ground. Temporary works provide that route. Done well, nothing above moves, ceilings stay intact and the floor below is not overloaded. Done badly, it is where structural work goes wrong.

Things to plan for

  • In the UK, temporary works are generally managed following BS 5975, the code of practice for temporary works procedures. On bigger jobs that means a named coordinator, a written design and checks before props are loaded or taken out.
  • Props take up floor space for the length of the job, usually in the rooms on both sides of the wall. Furniture needs moving back, and nobody else in the house should knock, adjust or hang anything from the props.
  • For simple openings, the engineer's calculations usually show the propping arrangement. Larger or unusual jobs, such as removing several walls or working beneath chimney stacks, may need a separate temporary works design prepared by an engineer.
  • The order of work matters. Props go in and are tightened before any masonry is cut, the opening is formed in stages, and the props stay until the permanent steel is packed tight and the bedding mortar has gained enough strength.
  • In older homes with lime mortar and soft bricks, the masonry above an opening can loosen once it is cut. The engineer may call for closer needle spacing or fuller support, because old walls can arch or drop in ways a modern wall does not.

From survey to sign-off in Egham

  1. Survey in Egham

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

How much should I budget in Egham?

As a guide, budget £170–£560 including VAT for temporary works and propping in Egham, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Temporary works and propping£170–£560Props, spreaders, needles and sole plates for a typical opening, installed and struck
Chimney breast removal (ground floor)£1,700–£3,350Ground-floor breast removed, steel to support the breast above, building control and making good
Load-bearing wall removal with steel beam£2,250–£5,600Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Party wall surveyor (agreed surveyor, per neighbour)£1,000–£2,250 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building control and neighbours in Egham

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Temporary works & propping near Egham

Local questions answered

Do you cover Egham for temporary works & propping?

Yes. We carry out temporary works & propping in Egham and the GU25, TW18, TW19 and TW20 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

How many props do I need to take out a load-bearing wall?

It depends on the span, the weight above and the strength of the floor the props stand on. The engineer's calculations or a temporary works design set the number and spacing. It is not something to guess, because too few props, or props in the wrong place, can let the structure move.

Does temporary propping need building control approval?

Not on its own, but the structural work it supports usually does. Removing a load-bearing wall or inserting a beam needs building regulations approval in England, Wales and Northern Ireland, and a building warrant in Scotland. The propping arrangement normally forms part of the engineer's calculations sent with that application.

How long do props have to stay in after a beam is fitted?

Until the permanent steel is packed tight and able to carry the load. That includes time for the padstone and packing mortar to gain enough strength, which depends on the mix and the weather. On a typical opening, props are in for a few days before being released gradually.