Steel BeamInstallers
Adjustable steel props and needles supporting a brick wall before an opening is formed

Temporary works & propping · Wimbledon

Temporary works & propping in Wimbledon

Steelwork, approvals and making good for temporary works & propping in Wimbledon and nearby.

  • Survey, design and installation in one
  • Covering CR4, KT3, SM4
  • Inspected before it is covered

Free survey in Wimbledon

Tell us about the temporary works & propping job in Wimbledon.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Temporary works & propping in Wimbledon: how it works

For homes in Wimbledon and the CR4, KT3, SM4, SW15 and SW17 districts, we handle temporary works & propping from survey to sign-off. We also cover the surrounding towns and villages in London. The beam is sized by a structural engineer and inspected before it is boxed in.

The moment a load-bearing wall is cut, whatever it was holding needs another route to the ground. Temporary works provide that route. Done well, nothing above moves, ceilings stay intact and the floor below is not overloaded. Done badly, it is where structural work goes wrong.

Worth knowing before you start

  • In the UK, temporary works are generally managed following BS 5975, the code of practice for temporary works procedures. On bigger jobs that means a named coordinator, a written design and checks before props are loaded or taken out.
  • When an external wall is propped, the opening is sheeted against rain and the house is kept secure overnight. Where props stand outside, ground conditions, drains and access paths are taken into account before they are set up.
  • Propping costs depend on how many props and needles the load calls for, how long they stay in, whether a separate temporary works design is required, and whether props must continue through a floor to reach solid ground.
  • The order of work matters. Props go in and are tightened before any masonry is cut, the opening is formed in stages, and the props stay until the permanent steel is packed tight and the bedding mortar has gained enough strength.
  • Props take up floor space for the length of the job, usually in the rooms on both sides of the wall. Furniture needs moving back, and nobody else in the house should knock, adjust or hang anything from the props.

From survey to sign-off in Wimbledon

  1. Free visit

    A short visit to Wimbledon to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

Guide prices for temporary works & propping in Wimbledon

As a guide, budget £190–£640 including VAT for temporary works and propping in Wimbledon, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Temporary works and propping£190–£640Props, spreaders, needles and sole plates for a typical opening, installed and struck
Lintel replacement£510–£1,540 per lintelPropping, removing the old lintel, new lintel set on beds and brickwork made good
Chimney breast removal (ground floor)£1,900–£3,850Ground-floor breast removed, steel to support the breast above, building control and making good
Structural calculations for a beam£320–£960Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building control and neighbours in Wimbledon

For Wimbledon, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Temporary works & propping near Wimbledon

Local questions answered

Who approves temporary works & propping in Wimbledon?

Structural work in Wimbledon needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Do you cover Wimbledon for temporary works & propping?

Yes. We carry out temporary works & propping in Wimbledon and the CR4, KT3, SM4, SW15 and SW17 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

How long do props have to stay in after a beam is fitted?

Until the permanent steel is packed tight and able to carry the load. That includes time for the padstone and packing mortar to gain enough strength, which depends on the mix and the weather. On a typical opening, props are in for a few days before being released gradually.

Can props damage my floor?

They can if they are set up carelessly. Each prop concentrates load on a small area, so sole plates or boards are used to spread it, and on suspended timber floors props may be carried through to the ground below. Floor coverings are protected with boards and sheeting before any prop goes in.

How many props do I need to take out a load-bearing wall?

It depends on the span, the weight above and the strength of the floor the props stand on. The engineer's calculations or a temporary works design set the number and spacing. It is not something to guess, because too few props, or props in the wrong place, can let the structure move.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.