
Temporary works & propping · Fulham
Temporary works & propping in Fulham
Steelwork, approvals and making good for temporary works & propping in Fulham and nearby.
- Itemised written quote
- Beam sized by a structural engineer
- Covering Fulham and nearby
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Temporary works & propping in Fulham: how it works
Planning temporary works & propping in Fulham? Our team covers SW3, SW5, SW6, SW7 and SW10 and the streets around them. Our coverage runs across London, so nearby villages are included too. You get one written quote for the calculations, approvals, propping, steel and making good.
The moment a load-bearing wall is cut, whatever it was holding needs another route to the ground. Temporary works provide that route. Done well, nothing above moves, ceilings stay intact and the floor below is not overloaded. Done badly, it is where structural work goes wrong.
Things to plan for
- Propping normally goes in on the first morning and stays until the beam is carrying. For a typical opening that is a few days, and longer where padstone mortar needs time to cure before the load is transferred onto it.
- Typical mistakes include props standing on unsupported floorboards, missing spreaders so one joist takes all the load, and props wound up too hard so the ceiling lifts and cracks. Careful setting out and gradual tightening avoid all three.
- Propping costs depend on how many props and needles the load calls for, how long they stay in, whether a separate temporary works design is required, and whether props must continue through a floor to reach solid ground.
- When an external wall is propped, the opening is sheeted against rain and the house is kept secure overnight. Where props stand outside, ground conditions, drains and access paths are taken into account before they are set up.
- Props and needles cannot go where pipes, cables or flues run. Their positions are checked against services before any holes are cut, and anything in the way is isolated or rerouted first by the appropriate trade.
What happens, step by step
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
Guide prices for temporary works & propping in Fulham
As a guide, budget £190–£640 including VAT for temporary works and propping in Fulham, based on published UK cost guides adjusted for London prices (+28%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Temporary works and propping | £190–£640 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
| Structural calculations for a beam | £320–£960 | Site measure or photos, beam and padstone design and calculations for building control |
| Chimney breast removal (ground floor) | £1,900–£3,850 | Ground-floor breast removed, steel to support the breast above, building control and making good |
| Party wall surveyor (agreed surveyor, per neighbour) | £1,150–£2,550 per neighbour | Schedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only) |
Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.
Building rules for Fulham
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Temporary works & propping near Fulham
- Chelsea 1.4 mi
- Putney 1.6 mi
- Battersea 1.9 mi
- Shepherds Bush 1.9 mi
- Barnes 2.2 mi
- Notting Hill 2.2 mi
Temporary works & propping in Fulham: your questions
Can you work on older or listed homes in Fulham?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
Can I stay at home while the work is done in Fulham?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
How many props do I need to take out a load-bearing wall?
It depends on the span, the weight above and the strength of the floor the props stand on. The engineer's calculations or a temporary works design set the number and spacing. It is not something to guess, because too few props, or props in the wrong place, can let the structure move.
Can props damage my floor?
They can if they are set up carelessly. Each prop concentrates load on a small area, so sole plates or boards are used to spread it, and on suspended timber floors props may be carried through to the ground below. Floor coverings are protected with boards and sheeting before any prop goes in.
Why do you need props to remove a wall?
Because the wall is holding up weight that still has to be supported while it is gone. Props and needles carry the floors, walls or roof above down to the ground until the new steel beam is fitted, packed and taking the load. Without them, the structure above could drop, crack or, at worst, collapse.