Temporary works & propping · Leicester
Temporary works & propping in Leicester
Steelwork, approvals and making good for temporary works & propping in Leicester and nearby.
- Survey, design and installation in one
- Covering LE1, LE2, LE3
- Inspected before it is covered
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Planning temporary works & propping in Leicester
We carry out temporary works & propping in Leicester, covering the LE1, LE2, LE3, LE4 and LE5 postcode districts. Our coverage runs across Leicestershire, so nearby villages are included too. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.
Propping is included in every structural job we quote, and we can also provide it as a separate service where a wall, lintel or chimney needs supporting while other work goes on. The layout of props, needles and spreaders follows the engineer's calculations or a temporary works design for the job.
Key points for your project
- Adjustable steel props are the workhorse, with timber spreaders on top to share the load across several joists. Steel needles pass through the wall to carry masonry above an opening, and prop head attachments known as masonry support heads support brickwork without needles.
- In older homes with lime mortar and soft bricks, the masonry above an opening can loosen once it is cut. The engineer may call for closer needle spacing or fuller support, because old walls can arch or drop in ways a modern wall does not.
- Every prop delivers a concentrated load that has to go somewhere. Before any are set up, the floor beneath is checked, because a suspended timber floor or a thin slab may not take that load without extra support carried down to the ground.
- Propping normally goes in on the first morning and stays until the beam is carrying. For a typical opening that is a few days, and longer where padstone mortar needs time to cure before the load is transferred onto it.
- Props and needles cannot go where pipes, cables or flues run. Their positions are checked against services before any holes are cut, and anything in the way is isolated or rerouted first by the appropriate trade.
How the job runs in Leicester
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
We submit a building notice or full plans application to Leicester City Council, so approval is in place before the wall is touched.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
Guide prices for temporary works & propping in Leicester
As a guide, budget £150–£490 including VAT for temporary works and propping in Leicester, based on published UK cost guides adjusted for prices in the East Midlands (-2%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Temporary works and propping | £150–£490 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
| Party wall surveyor (agreed surveyor, per neighbour) | £880–£1,960 per neighbour | Schedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only) |
| Chimney breast removal (ground floor) | £1,450–£2,950 | Ground-floor breast removed, steel to support the breast above, building control and making good |
| RSJ supply and fit (single beam) | £780–£2,450 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
Figures include our approximate regional adjustment for prices in the East Midlands (-2%) and are rounded. How these figures are worked out.
Approvals in Leicester
Structural openings in English homes need building regulations approval before work starts. Leicester City Council can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Temporary works & propping near Leicester
- Oadby 3.0 mi
- Wigston Magna 4.3 mi
- Loughborough 9.3 mi
- Coalville 11.5 mi
- Hinckley 12.4 mi
- Melton Mowbray 13.5 mi
Temporary works & propping in Leicester: your questions
Do you also work near Leicester?
Yes. We also cover nearby towns including Oadby, Wigston Magna, Loughborough and Coalville.
How much do temporary works & propping cost in Leicester?
As a guide, budget £150–£490 including VAT for temporary works and propping in Leicester, based on published UK cost guides adjusted for prices in the East Midlands (-2%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.
How many props do I need to take out a load-bearing wall?
It depends on the span, the weight above and the strength of the floor the props stand on. The engineer's calculations or a temporary works design set the number and spacing. It is not something to guess, because too few props, or props in the wrong place, can let the structure move.
Do I need a temporary works design for my job?
Not always. For a simple single opening, the propping shown in the engineer's calculations is often enough. Bigger or more complex jobs, such as removing several walls, supporting chimney stacks or replacing a shopfront beam, may need a separate temporary works design from an engineer, following the BS 5975 approach.
Why do you need props to remove a wall?
Because the wall is holding up weight that still has to be supported while it is gone. Props and needles carry the floors, walls or roof above down to the ground until the new steel beam is fitted, packed and taking the load. Without them, the structure above could drop, crack or, at worst, collapse.