Steel BeamInstallers
Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · Leicester

Chimney breast removal in Leicester

Chimney breast removal for homes in LE1, LE2, LE3, designed by a structural engineer.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Leicester and nearby

Free survey in Leicester

Tell us about the chimney breast removal job in Leicester.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning chimney breast removal in Leicester

Chimney breast removal in Leicester is planned around the house, not a standard kit. Our coverage runs across Leicestershire, so nearby villages are included too. We visit, measure and check what the wall carries, then arrange calculations and building control approval before any steel is ordered.

We cover the survey visit, structural calculations from a qualified engineer, building control, party wall notices through a party wall surveyor where needed, temporary support, removal, the steelwork and making good. Whether you are taking out the ground-floor breast only or the full height, the itemised written quote shows each stage.

Key points for your project

  • Removing a ground-floor breast with steel support typically takes two to four working days. Full-height removal including the stack and roof repair takes longer and depends on scaffolding, roofing access and the weather.
  • A flue still serving a gas fire, boiler or wood burner cannot be removed until that appliance is disconnected and an alternative arranged. Work on any gas appliance or pipe must, by law, be done by a Gas Safe registered engineer.
  • In England and Wales, cutting away a chimney breast attached to a party wall is notifiable work under the Party Wall etc. Act 1996. Notice must be served on the neighbour before work begins, and their response decides whether party wall surveyors need to be appointed.
  • In terraces and semis the chimney stack usually serves both houses, with flues from each side rising together. You can generally only alter your own side, and the work must not weaken your neighbour's breast or flues, which is why party wall procedures often apply.
  • If you remove the breast in a ground-floor room but want to keep a fireplace or the breast in the bedroom above, the steel underneath must be designed for that load. Its ends need solid bearings, which may mean pockets cut into the party wall.

Four stages, one team

  1. Free visit

    A short visit to Leicester to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to Leicester City Council, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What does chimney breast removal cost in Leicester?

As a guide, budget £1,450–£2,950 including VAT for chimney breast removal (ground floor) in Leicester, based on published UK cost guides adjusted for prices in the East Midlands (-2%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,450–£2,950Ground-floor breast removed, steel to support the breast above, building control and making good
Load-bearing wall removal with steel beam£1,950–£4,900Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Plastering and making good£290–£1,180Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Through-lounge knock-through£2,450–£5,400Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill

Figures include our approximate regional adjustment for prices in the East Midlands (-2%) and are rounded. How these figures are worked out.

Approvals in Leicester

For Leicester, building control is provided by Leicester City Council, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Chimney breast removal near Leicester

Chimney breast removal in Leicester: your questions

What happens at the survey visit in Leicester?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

How long does chimney breast removal take?

A ground-floor breast with a steel beam supporting the masonry above usually takes two to four working days, including propping, fitting the steel, removing the brickwork and basic making good. Full removal from ground floor to roof takes longer because of scaffolding, roofing work and weather, and plaster needs time to dry afterwards.

Do I need my neighbour's permission to remove a chimney breast?

Not permission as such, but in England and Wales you must serve notice under the Party Wall etc. Act 1996 if the breast is attached to a party wall, and your neighbour can consent or dissent. You cannot remove their half of a shared stack. Scotland and Northern Ireland have no equivalent Act, so the title deeds and general law apply.

What is included in a chimney breast removal quote?

The itemised written quote covers the survey, engineer's calculations, building control, any party wall notices, temporary support, the steel or other support specified, removal and waste, venting or capping, and plastering and floor making good. Scaffolding and roof work appear as separate lines where the stack is involved, and the price is fixed in writing once the scope is agreed.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.