Adjustable steel props and needles supporting a brick wall before an opening is formed

Temporary works & propping · Southampton

Temporary works & propping in Southampton

Temporary works & propping in Southampton, from free survey to completion certificate.

  • Survey, design and installation in one
  • Covering SO14, SO15, SO16
  • Inspected before it is covered

Free survey in Southampton

Tell us about the temporary works & propping job in Southampton.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our temporary works & propping service in Southampton

Planning temporary works & propping in Southampton? Our team covers SO14, SO15, SO16, SO17 and SO18 and the streets around them. We also cover the surrounding towns and villages in Hampshire. You get one written quote for the calculations, approvals, propping, steel and making good.

Propping is included in every structural job we quote, and we can also provide it as a separate service where a wall, lintel or chimney needs supporting while other work goes on. The layout of props, needles and spreaders follows the engineer's calculations or a temporary works design for the job.

Key points for your project

  • Props and needles cannot go where pipes, cables or flues run. Their positions are checked against services before any holes are cut, and anything in the way is isolated or rerouted first by the appropriate trade.
  • Every prop delivers a concentrated load that has to go somewhere. Before any are set up, the floor beneath is checked, because a suspended timber floor or a thin slab may not take that load without extra support carried down to the ground.
  • Propping normally goes in on the first morning and stays until the beam is carrying. For a typical opening that is a few days, and longer where padstone mortar needs time to cure before the load is transferred onto it.
  • Typical mistakes include props standing on unsupported floorboards, missing spreaders so one joist takes all the load, and props wound up too hard so the ceiling lifts and cracks. Careful setting out and gradual tightening avoid all three.
  • When an external wall is propped, the opening is sheeted against rain and the house is kept secure overnight. Where props stand outside, ground conditions, drains and access paths are taken into account before they are set up.

Four stages, one team

  1. Free visit

    A short visit to Southampton to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to Southampton City Council, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

How much should I budget in Southampton?

As a guide, budget £170–£560 including VAT for temporary works and propping in Southampton, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Temporary works and propping£170–£560Props, spreaders, needles and sole plates for a typical opening, installed and struck
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control
RSJ supply and fit (single beam)£900–£2,800 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Lintel replacement£450–£1,340 per lintelPropping, removing the old lintel, new lintel set on beds and brickwork made good

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Approvals in Southampton

Structural openings in English homes need building regulations approval before work starts. Southampton City Council can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Temporary works & propping near Southampton

Temporary works & propping in Southampton: your questions

How much do temporary works & propping cost in Southampton?

As a guide, budget £170–£560 including VAT for temporary works and propping in Southampton, based on published UK cost guides adjusted for prices in the South East (+12%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Do you cover Southampton for temporary works & propping?

Yes. We carry out temporary works & propping in Southampton and the SO14, SO15, SO16, SO17 and SO18 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

How many props do I need to take out a load-bearing wall?

It depends on the span, the weight above and the strength of the floor the props stand on. The engineer's calculations or a temporary works design set the number and spacing. It is not something to guess, because too few props, or props in the wrong place, can let the structure move.

Does temporary propping need building control approval?

Not on its own, but the structural work it supports usually does. Removing a load-bearing wall or inserting a beam needs building regulations approval in England, Wales and Northern Ireland, and a building warrant in Scotland. The propping arrangement normally forms part of the engineer's calculations sent with that application.

Can props damage my floor?

They can if they are set up carelessly. Each prop concentrates load on a small area, so sole plates or boards are used to spread it, and on suspended timber floors props may be carried through to the ground below. Floor coverings are protected with boards and sheeting before any prop goes in.

Planning to take a wall out?