Steel BeamInstallers
Grey steel goalpost frame installed where a rear wall has been removed

Steel goalpost frames · Staffordshire

Steel goalpost frames in Staffordshire

Survey, engineer's design and installation of steel goalpost frames anywhere in Staffordshire.

  • Survey, design and installation in one
  • Covering B77, B78, B79, DE13
  • Inspected before it is covered

Free survey in Staffordshire

Tell us about your steel goalpost frames project in Staffordshire.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning steel goalpost frames in Staffordshire

A steel goalpost frame is a beam supported on two steel columns, bolted together into one rigid unit shaped like a goalpost. It is used where the masonry either side of an opening cannot take the beam's load, or where a wide opening leaves little wall to bear on. The columns stand on base plates fixed to concrete pad foundations sized by the engineer.

Across Staffordshire, steel goalpost frames usually come up when people want more light, a better layout or a way through to a new extension. Towns we cover include Longton, Tamworth and Kidsgrove, among other places in the area. Whatever the reason, the beam is sized from calculations and the work is inspected before anything is covered.

Key points for your project

  • Stability is part of the design, not just strength. A frame standing in a wide opening can sway sideways if the joints are too flexible, so the engineer decides whether the connections must be moment-resisting or whether the frame is tied back to the surrounding structure.
  • A goalpost frame usually takes longer than a single beam because the pads need digging, inspecting, pouring and time to gain strength before the columns take load. The engineer sets when the frame can be loaded.
  • Goalpost frames are made to measure, so accurate site dimensions matter. Floor-to-ceiling height, the finished floor level and the width between column positions are taken before fabrication, because a frame that is a few millimetres out cannot simply be trimmed on site.
  • While the old wall or piers come out, the floor, walls and roof above are held on props and needles. These stay in until the frame is fully bolted, levelled and packed, so the structure is never left without support.
  • Columns can be boxed in with fire-rated plasterboard to look like small piers, built into new stud walls, or left exposed and painted. Where an extension wall continues past the opening, a column can often sit within it out of sight.

Four stages, one team

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

What do steel goalpost frames cost in Staffordshire?

As a guide, budget £2,000–£6,000 including VAT for steel goalpost frame in Staffordshire, based on published UK cost guides adjusted for prices in the West Midlands (no adjustment).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£2,000–£6,000Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Steel column or post£500–£1,500 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Side return extension steelwork£3,500–£8,500Beams and posts along the old side wall line, propping and approvals (extension build extra)
Rear wall opening for bi-fold or sliding doors£2,500–£7,000External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)

Figures include our approximate regional adjustment for prices in the West Midlands (no adjustment) and are rounded. How these figures are worked out.

Approvals in Staffordshire

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Local questions answered

Do you cover Staffordshire for steel goalpost frames?

Yes. We carry out steel goalpost frames in Staffordshire. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

What happens at the survey visit in Staffordshire?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Are goalpost frames welded or bolted?

Most domestic goalposts are bolted, with plates welded to the beam and columns in the fabrication shop and bolted together on site. That lets each piece be carried into the house separately. The engineer specifies the connection details, including whether the joints need to resist sway, and the fabricator makes the frame to suit.

What is the difference between a goalpost and a portal frame?

A domestic goalpost is a simple version of a portal frame. Both use columns and a beam joined together, but a full portal frame has rigid joints designed to resist sideways loads on its own, as used in steel-framed industrial buildings. In a house, the engineer decides how rigid the goalpost joints need to be for that opening.

Do I need building regulations approval for a goalpost frame?

Yes. Installing a goalpost frame is structural building work. In England it needs building regulations approval through a full plans application or building notice, in Wales an application under the Welsh regulations, in Scotland a building warrant must be granted first, and in Northern Ireland the council's building control is applied to before work begins. We arrange the application and inspections.

Can a goalpost column go next to my neighbour's wall?

It can, but in England and Wales it may bring in the Party Wall etc. Act 1996. Digging a pad near a neighbour's building to below the level of its foundations, or fixing into a shared wall, can be notifiable. We arrange notices through a party wall surveyor where needed. There is no equivalent Act in Scotland or Northern Ireland.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.