Steel BeamInstallers
Grey steel goalpost frame installed where a rear wall has been removed

Steel goalpost frames · Purley

Steel goalpost frames in Purley

Steelwork, approvals and making good for steel goalpost frames in Purley and nearby.

  • Free survey visit in Purley
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Purley

Tell us about the steel goalpost frame job in Purley.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning steel goalpost frames in Purley

Steel goalpost frames in Purley are planned around the house, not a standard kit. Our coverage runs across London, so nearby villages are included too. We visit, measure and check what the wall carries, then arrange calculations and building control approval before any steel is ordered.

We arrange the engineer's design, building control, the foundation pads, temporary propping and the fabricated frame, then box it in and make good. Everything is set out in one itemised written quote, and the price is fixed in writing once the layout and specification are agreed.

Worth knowing before you start

  • A goalpost frame usually takes longer than a single beam because the pads need digging, inspecting, pouring and time to gain strength before the columns take load. The engineer sets when the frame can be loaded.
  • Column pads can clash with drains, gas pipes and underfloor heating runs below the floor. These are located before digging, and if a drain runs where a pad needs to go, the engineer may move the column or redesign the pad.
  • While the old wall or piers come out, the floor, walls and roof above are held on props and needles. These stay in until the frame is fully bolted, levelled and packed, so the structure is never left without support.
  • A goalpost frame differs from a simple beam because the beam does not rely on the walls at its ends. The two columns and the beam are connected so the whole frame carries the load down into foundations of its own.
  • Columns can be boxed in with fire-rated plasterboard to look like small piers, built into new stud walls, or left exposed and painted. Where an extension wall continues past the opening, a column can often sit within it out of sight.

How the job runs in Purley

  1. Survey in Purley

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

Guide prices for steel goalpost frames in Purley

As a guide, budget £2,550–£7,700 including VAT for steel goalpost frame in Purley, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£2,550–£7,700Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Steel column or post£640–£1,920 per columnColumn supplied and fitted with base and cap plates on a pad foundation
RSJ supply and fit (single beam)£1,000–£3,200 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Rear wall opening for bi-fold or sliding doors£3,200–£8,950External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Approvals in Purley

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Steel goalpost frames near Purley

Steel goalpost frames in Purley: your questions

Who approves steel goalpost frames in Purley?

Structural work in Purley needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Do you also work near Purley?

Yes. We also cover nearby towns including Coulsdon, South Croydon, Wallington and Carshalton.

How long does it take to install a steel goalpost?

Allow around one to two weeks on site for a typical job. Breaking out and digging the pads, the foundation inspection, pouring concrete and letting it gain strength take up much of that time. Erecting and bolting the frame itself is often done in a day, followed by inspection and boxing in.

Is a goalpost frame more expensive than a beam?

Generally yes, because there is more steel, more fabrication and new foundations to dig and pour. Against that, a goalpost can avoid rebuilding weak piers or strengthening walls so they can take a beam. Our itemised written quote shows the frame, pads, propping and making good separately so you can see where the cost sits.

What is the difference between a goalpost and a portal frame?

A domestic goalpost is a simple version of a portal frame. Both use columns and a beam joined together, but a full portal frame has rigid joints designed to resist sideways loads on its own, as used in steel-framed industrial buildings. In a house, the engineer decides how rigid the goalpost joints need to be for that opening.

What happens at the survey visit in Purley?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.