Steel BeamInstallers
Grey steel goalpost frame installed where a rear wall has been removed

Steel goalpost frames · Beckenham

Steel goalpost frames in Beckenham

Steel goalpost frames for homes in BR1, BR3, BR4, designed by a structural engineer.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Beckenham

Tell us about the steel goalpost frame job in Beckenham.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What steel goalpost frames involve in Beckenham

Beckenham has a mix of housing, and steel goalpost frames need a slightly different approach in each. Our coverage runs across London, so nearby villages are included too. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.

We arrange the engineer's design, building control, the foundation pads, temporary propping and the fabricated frame, then box it in and make good. Everything is set out in one itemised written quote, and the price is fixed in writing once the layout and specification are agreed.

Worth knowing before you start

  • While the old wall or piers come out, the floor, walls and roof above are held on props and needles. These stay in until the frame is fully bolted, levelled and packed, so the structure is never left without support.
  • Columns can be boxed in with fire-rated plasterboard to look like small piers, built into new stud walls, or left exposed and painted. Where an extension wall continues past the opening, a column can often sit within it out of sight.
  • Columns are commonly universal columns or square hollow sections, welded to steel base plates at the foot and cap plates at the head. Holding-down bolts fix the base plates to the pad, and grout fills the gap beneath once the frame is level.
  • A goalpost frame is structural work, so building regulations approval is needed in England and Wales, a building warrant before work in Scotland, and a building control application in Northern Ireland. The inspector typically wants to see the pad excavations as well as the finished steel.
  • Column pads can clash with drains, gas pipes and underfloor heating runs below the floor. These are located before digging, and if a drain runs where a pad needs to go, the engineer may move the column or redesign the pad.

What happens, step by step

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for steel goalpost frames in Beckenham

As a guide, budget £2,550–£7,700 including VAT for steel goalpost frame in Beckenham, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£2,550–£7,700Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Structural calculations for a beam£320–£960Site measure or photos, beam and padstone design and calculations for building control
Steel column or post£640–£1,920 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Opening into a rear extension£3,200–£8,950Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building control and neighbours in Beckenham

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Steel goalpost frames near Beckenham

Questions about steel goalpost frames in Beckenham

How much do steel goalpost frames cost in Beckenham?

As a guide, budget £2,550–£7,700 including VAT for steel goalpost frame in Beckenham, based on published UK cost guides adjusted for London prices (+28%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

What happens at the survey visit in Beckenham?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

What is a goalpost frame in an extension?

A goalpost frame is a steel beam sitting on two steel columns, bolted together so it stands as one unit. In an extension it is usually placed where the old rear wall was, holding up the house above while leaving a wide, clear opening. The columns rest on concrete pads, so the frame does not depend on the surrounding brickwork.

Does a goalpost frame need foundations?

Yes, in most cases each column needs a concrete pad foundation beneath it. A column concentrates a lot of weight on a small area, and a normal floor slab is rarely designed for that. The engineer sizes each pad, and building control usually inspects the excavation before the concrete goes in.

What is the difference between a goalpost and a portal frame?

A domestic goalpost is a simple version of a portal frame. Both use columns and a beam joined together, but a full portal frame has rigid joints designed to resist sideways loads on its own, as used in steel-framed industrial buildings. In a house, the engineer decides how rigid the goalpost joints need to be for that opening.

Can you work on older or listed homes in Beckenham?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.